36/65
9. Close the INLET TUBE ASSY with the FRONT HOUSING CONTROL UNIT
25. Cover the cable with a piece of heat shrink tubing Ø8 – Ø4 long enough to wrap a portion of the grey
sheath that covers the cable.
26. Connect the PCB CONTROL UNIT with the connector that was created.
27. Complete the other connections of the PCB CONTROL UNIT
36-1
36-2
36-3
36-4
36-5
36-6
36-7
Summary of Contents for i-team i-mop xxl
Page 1: ...1 64 i mop xxl Service Manual Jan 2018 Warning read the instructions before using the machine...
Page 11: ...11 64 Internal view 1 Vacuum motor filter 2 Transparent plastic deflector 3 Vacuum hose 2 3 1...
Page 53: ...53 65 2 14 Fasten 3pcs EJOT SCREW 50X14 to fix the COVER BRUSH MOTOR SCREW each side 53 1...
Page 57: ...CHAPTER 16 ELECTRICAL SCHEME 57 65 57 1...
Page 61: ...D if the reading is above 16V the battery is OK 61 65 61 1 61 2...