24/65
7. Take the MACHINE BATTERY CONTROL PCB ASSY out of the MAIN LEVER COVER by removing
10 SCREWS EJOT DELTA PT 25X10
8. Block the POWER CABLE 3 WIRES with a CABLE TIE 3X15 to the MAIN LEVER COVE
9. Put the cables through the MACHINE BATTERY CONTROL PCB ASSY following the scheme of the
pictures below
10. Block the MACHINE BATTERY CONTROL PCB ASSY to the MAIN LEVER COVER with 10 SCREWS
EJOT DELTA PT 25X10
24-2
24-1
24-4
24-3
24-5
24-6
Summary of Contents for i-team i-mop xxl
Page 1: ...1 64 i mop xxl Service Manual Jan 2018 Warning read the instructions before using the machine...
Page 11: ...11 64 Internal view 1 Vacuum motor filter 2 Transparent plastic deflector 3 Vacuum hose 2 3 1...
Page 53: ...53 65 2 14 Fasten 3pcs EJOT SCREW 50X14 to fix the COVER BRUSH MOTOR SCREW each side 53 1...
Page 57: ...CHAPTER 16 ELECTRICAL SCHEME 57 65 57 1...
Page 61: ...D if the reading is above 16V the battery is OK 61 65 61 1 61 2...