26/65
14. Block the UTP CABLE with a CABLE TIE 3.5X30, , remove the residue of the cable tie with a diagonal
cutting pliers.
15. Put a small piece of HEAT SHRINK TUBING around the ESD CABLE and bend it with an angle of 90°,
16. Shrink the HEAT SHRINK TUBING with a hair-dryer/hot air gun
17. Block the HEAT SHRINK TUBING with a drop of LOCTITE 502
18. Add the 3pcs Thermal Conductive Pad 14X17X2 MM onto the HEAT SINKS
26-1
26-2
26-3
26-4
26-6
26-7
26-8
26-5
Summary of Contents for i-team i-mop xxl
Page 1: ...1 64 i mop xxl Service Manual Jan 2018 Warning read the instructions before using the machine...
Page 11: ...11 64 Internal view 1 Vacuum motor filter 2 Transparent plastic deflector 3 Vacuum hose 2 3 1...
Page 53: ...53 65 2 14 Fasten 3pcs EJOT SCREW 50X14 to fix the COVER BRUSH MOTOR SCREW each side 53 1...
Page 57: ...CHAPTER 16 ELECTRICAL SCHEME 57 65 57 1...
Page 61: ...D if the reading is above 16V the battery is OK 61 65 61 1 61 2...