Server Installation and Maintenance
Maintaining the Server
39
Lightspeed G-Series Guide
6.
Secure the drive to the carrier with the four M3 screws retained from removal.
Gently tighten but do not over tighten the screws, which could cause damage.
7.
Slide the drive carrier into its bay with the drive facing up until the drive seats firmly
in the rear connector.
8.
Push the carrier handle closed flat against the front of the carrier to secure the
carrier and drive in place.
9.
Replace the front bezel on the chassis, and go to the next topic to rebuild the RAID.
Rebuilding the Lightspeed RAID
If you receive a RAID error message from a Lightspeed server instructing you to rebuild
a RAID drive, a tool and instructions for rebuilding the RAID are included in the software
provided with the server. The path to the RAID UI and the docs is
C:\Program Files (x86)\Intel\Intel(R) Rapid Storage Technology enterprise
.
•
The UI software is
IAStorUI.exe
.
•
The IAStorUI documentation is
IAStorHelp.exe
.
Replacing Power Supplies
The Lightspeed Server includes two redundant, hot-pluggable power supply modules.
They automatically sense the input voltage between 100V to 240V, and operate at that
voltage. Power cords plug directly into the power supply units at the back of the
chassis. A green light indicates that the power supply is operating. When a power
supply fails or loses power, an amber light on the power supply illuminates and an
alarm sounds.
If either of the power supply modules fail, the other module will support the full load
and will allow the system to continue operation without interruption. The PWR Fail LED
will illuminate and remain on until the failed unit has been replaced. Replace with the
same model. Replacement units can be ordered from Telestream. See
Support | Information | Assistance
later in this chapter.