97
Appendix C: VCR and Swagelok Fittings
C.1
VCR
®
Fittings
The VCR fittings are completely assembled and are ready to be connected. Fittings on
the PI-MTE coolant pipes are VCR size ¼” male glands with gasket retainer assemblies
containing copper gaskets. The flex tubing has female fittings on both ends and the 2¾”
ConFlat has male fittings on both ends. See
.
Figure C-1: VCR Fittings
C.1.1
Installation Procedure
Perform the following procedure to connect/install the VCR fittings:
1. Verify that the gasket retaining assembly with copper gasket has been installed on
the male fitting. Align the male and female fittings as illustrated in
Figure C-2: Align Male and Female Fittings
2. Finger-tighten the connection. See
.
Figure C-3: Finger Tighten Connection
4
4
11-
009
7_
0
0
5
8
PI-MTE C
OOLANT
P
IPE
M
ALE
F
ITTING
G
ASKET
R
ETAINER
A
SSEMBLY
F
EMALE
F
ITTING
F
LEX
T
UBING
4
4
11
-009
7_
005
9
4
4
11-
009
7_
00
6
0
Summary of Contents for Princeton Instruments PI-MTE
Page 1: ...www princetoninstruments com PI MTE System Manual 4411 0097 Issue 6 October 1 2019...
Page 22: ...22 PI MTE System Manual Issue 6 This page is intentionally blank...
Page 25: ...Chapter 3 Installation 25 PI MTE System Diagram 4411 0097_0014...
Page 26: ...26 PI MTE System Manual Issue 6 This page is intentionally blank...
Page 58: ...58 PI MTE System Manual Issue 6 This page is intentionally blank...
Page 90: ...90 PI MTE System Manual Issue 6 This page is intentionally blank...
Page 94: ...94 PI MTE System Manual Issue 6 Figure B 2 PI MTE Camera 8 01 05 and later 4411 0097_0054...
Page 95: ...Appendix B Outline Drawings 95 Figure B 3 PI MTE Camera 8 01 05 and earlier 4411 0097_0055...
Page 102: ...102 PI MTE System Manual Issue 6 This page is intentionally blank...
Page 112: ...112 PI MTE System Manual Issue 6 This page is intentionally blank...
Page 117: ...This page is intentionally blank...