
ADFM® Flow Meter
Section 2 Setup and Installation
2-28
The long side of the sensor must be parallel with the longitudinal
axis of the channel.
Figure 2-26 Sensor alignment with channel wall
Sites where a large amount of aeration or turbulence will be
present often require the use of a secondary pressure transducer.
In these cases, the mounting of the secondary sensor, including
elevation and orientation, must also be considered.
2.6.3 Pro20: Cabling
Be careful to route the cable away from the side of the sensor
where it is attached. Improper cable routing increases the possi-
bility of debris fouling.
Figure 2-27 Sensor cable direction
During installation, ensure that the cable connector end is sealed
for protection in case it comes into contact with water.
If a mounting apparatus (such as a ring or rectangular frame) is
used, cables should be fastened to its downstream side. All per-
manent installations require the cables to be secured to the
channel wall and mounting apparatus with rubber-cushioned
stainless steel loop straps at 6" (nominal) intervals.
NO
YES
Flow
Flow
YES
NO
Minimum bend
radius 6”
Flow
Flow
Summary of Contents for ADFM Hot Tap
Page 2: ......
Page 4: ......
Page 20: ...ADFM Flow Meter Section 1 Introduction 1 10 ...
Page 85: ...ADFM Flow Meter Section 2 Setup and Installation 2 65 Figure 2 73 Viewing data in Expert View ...
Page 86: ...ADFM Flow Meter Section 2 Setup and Installation 2 66 ...
Page 98: ...ADFM Flow Meter Section 3 Maintenance and Troubleshooting 3 12 ...
Page 114: ......
Page 116: ......