ADFM® Flow Meter
Section 2 Setup and Installation
2-18
2.4 Preparing for
Installation
Before deployment, your system configuration and site charac-
teristics must be determined. This section will help you to
prepare the ADFM for deployment.
2.4.1 Installation Checklist
The general sequence of steps in the installation and deployment
of the ADFM are as follows:
1. Determine the installation site and sensor mounting loca-
tion according to site requirements.
2. Measure and record all channel dimensions and determine
geometry.
3. Prepare your laptop PC with Isco WinADFM software, to
take to the installation site.
4. Perform pre-installation equipment and operational
checks.
5. Install and secure the ADFM controller, and connect the
sensor.
6. Connect power and conduct final tests.
7. Program the desired data logging parameters into the
ADFM.
Summary of Contents for ADFM Hot Tap
Page 2: ......
Page 4: ......
Page 20: ...ADFM Flow Meter Section 1 Introduction 1 10 ...
Page 85: ...ADFM Flow Meter Section 2 Setup and Installation 2 65 Figure 2 73 Viewing data in Expert View ...
Page 86: ...ADFM Flow Meter Section 2 Setup and Installation 2 66 ...
Page 98: ...ADFM Flow Meter Section 3 Maintenance and Troubleshooting 3 12 ...
Page 114: ......
Page 116: ......