Frontline Harmony Hardware & Software User Manual
33
LL/CON/MAS/BV-60-C
Constant Tone Extension Request Procedure, IUT Initiated, Timeout
LL/CON/MAS/BV-61-C
Constant Tone Extension Request Procedure, IUT Responding, AoA
LL/CON/MAS/BV-62-C
Constant Tone Extension Request Procedure, IUT Responding, Responses
Disabled
LL/CON/MAS/BV-63-C
Constant Tone Extension Request Procedure, IUT Initiated, AoD – LE 1M
PHY
LL/CON/MAS/BV-64-C
Constant Tone Extension Request Procedure, IUT Responding, AoD
LL/CON/MAS/BV-65-C
Unrequested Constant Tone Extension, IUT Receiving, AoA – LE 1M PHY
LL/CON/MAS/BV-66-C
Unrequested Constant Tone Extension, IUT Receiving, AoD – LE 1M PHY
LL/CON/MAS/BV-67-C
Constant Tone Extension Request Procedure, IUT Initiated, AoA, Encrypted
Connection – LE 1M PHY
LL/CON/MAS/BV-68-C
Constant Tone Extension Request Procedure, IUT Responding, AoA,
Encrypted Connection
LL/CON/MAS/BV-69-C
Constant Tone Extension Request Procedure, IUT Initiated, AoD, Encrypted
Connection – LE 1M PHY
LL/CON/MAS/BV-70-C
Constant Tone Extension Request Procedure, IUT Responding, AoD,
Encrypted Connection
LL/CON/MAS/BV-71-C
Constant Tone Extension Request Procedure, IUT Initiated, AoA, Incorrect
CRC – LE 1M PHY
LL/CON/MAS/BV-73-C
Verify that the IUT as Master correctly handles reception of an
LL_LENGTH_REQ PDU on the LE 1M PHY
LL/CON/MAS/BV-74-C
Verify that a master IUT is able to perform the Data Length Update
Procedure by sending an LL_LENGTH_REQ PDU on the LE 1M PHY
LL/CON/MAS/BV-75-C
Verify that the IUT as Master correctly handles communication with a
Lower Tester that does not support the Data Length Update Procedure
LL/CON/MAS/BV-76-C
Verify that the IUT as Master correctly handles reception of an
LL_LENGTH_REQ PDU on the LE 2M PHY
LL/CON/MAS/BV-77-C
Verify that a master IUT is able to perform the Data Length Update
Procedure by sending an LL_LENGTH_REQ PDU on the LE 2M PHY
LL/CON/MAS/BV-78-C
Verify that the IUT as Master correctly handles reception of an
LL_LENGTH_REQ PDU on the LE Coded PHY
LL/CON/MAS/BV-79-C
Verify that a master IUT is able to perform the Data Length Update
Procedure by sending an LL_LENGTH_REQ PDU on the LE Coded PHY
LL/CON/MAS/BV-80-C
Verify that the IUT as Master correctly handles communication with a
Lower Tester that does not support the Data Length Update Procedure on
LE Coded PHY
LL/CON/MAS/BV-81-C
Test that a master IUT is able to perform the connection parameter request
procedure when a feature exchange has not been performed and the
remote device does not support the request
LL/CON/MAS/BV-82-C
Test that a master IUT is able to perform the connection parameter request
procedure after the feature exchange reveals that the remote device does
not support the request
LL/CON/MAS/BV-83-C
Constant Tone Extension Request Procedure, IUT Responding, Unsupported
LL/CON/MAS/BV-84-C
Periodic Advertising Sync Transfer Procedure, Advertising IUT Initiated
LL/CON/MAS/BV-85-C
Periodic Advertising Sync Transfer Procedure, Advertising IUT Initiated
LL/CON/MAS/BV-86-C
Periodic Advertising Sync Transfer Procedure, Advertising IUT Initiated
Summary of Contents for FrontLine Harmony
Page 1: ...Harmony Test System User Manual...
Page 7: ...Frontline Harmony Hardware Software User Manual 7 Figure 1 1 Installed Applications Detected...
Page 25: ...Frontline Harmony Hardware Software User Manual 25 Figure 3 5 IUT Information...
Page 55: ...Frontline Harmony Hardware Software User Manual 55 Figure 5 4 Testing Summary...