4  LTX Panel Cable and Fiber Installation and Routing

4.1.1   IFC Cable Installation and Routing

4.1  Cable Installation and Routing

LTX Patch and Splice Panels can be used to either interconnect or cross-connect Network Elements (NE). The panels are typically used to 
interconnect IF (IntraFacility) splices from the LTX Panel to network elements, to interconnect one system of network elements to another, as in 
a demarcation, or to cross-connect network elements within the same system.

Fiber installation involves splicing, storage, and patching using LTX Splice and Patch Panels. Splicing begins with installation of the IntraFacility 
Cable (IFC) at the rear of the LTX Panel. Each IFC ribbon fi ber contains 12 optic fi bers. Each LTX splice tray handles up to 36 splices (three 
IFC fi ber ribbons).

The IFC routes to the LTX panel from above or below and is clamped at the side of the LTX panel with a cable clamp that holds it in position. 
Protected ribbon fi bers then route around splice trays in the slack storage area of the LTX panel.  Extra ribbon should be measured out and 
routed through the panel to provide for splicing requirements.

In the rear of the LTX panel and at the front of the splice trays, cables are clamped and unprotected fi ber ribbons are measured out and routed 
through the splice tray to splice sleeve holders.

At the rear of the LTX panel, pigtail fi ber strands route from connectors that attach to adapters with fi ber jumpers at the front of the LTX panel. 
The pigtail fi bers route into the splice tray at the corner opposite to where the incoming IFC ribbon fi bers route into the tray.

The loose ribbon and pigtail fi ber strands are then spliced (interconnected) with resulting splices placed into splice sleeve holders in the center of 
the splice tray.

WARNING

WARNING!  To avoid eye damage or blindness, never look directly into fi bers or connectors.

The IntraFacility Cable (IFC) is brought in from above or below the LTX Patch and Splice Panel.

The IFC is clamped to the cable clamp mounted on the top rear corner of the LTX panel. Protected 12-strand fi ber ribbons route from the cable 
into the LTX panel through the slack storage area. Routing spools protect splice trays from routed cables.  Cables can be secured in the panel 
with velcro bands that attach to tie down slots on the tray platform and along the sides and top of the LTX panel. 

At the splice tray, 12-strand ribbon fi bers are broken out of the protected cabling and route through the tray for splicing.

CAUTION

CAUTION!  Do not connect fi bers to the adapters before all pigtail fi bers have been installed and spliced at the splice tray.

CAUTION!  Wear safety glasses while working with exposed fi ber optic fi ber. Do not touch eyes while working with fi ber optic fi bers.

Summary of Contents for LTX

Page 1: ...LTX LTX Patch and Splice Panel Patch and Splice Panel ...

Page 2: ... Telect Inc All rights reserved 148326 09 08 16 v2 1 509 926 6000 telect com 2 LTX Patch and Splice Panel LTX Patch and Splice Panel Fiber Install guide This page intentionally left blank ...

Page 3: ...ber Holder 13 3 1 8 Install Adapter Patch Plate 14 3 1 9 Install Panel Doors 14 3 1 10 Install Designation Labels 15 3 1 11 Install Mounting Brackets to the LTX Panel 15 3 2 Install and Ground the LTX Panel to the Rack 16 4 LTX Patch and Splice Panel Cable and Fiber Installation and Routing 17 4 1 Cable Installation and Routing 17 4 1 1 IFC Cable Installation and Routing 17 4 1 2 Install IFC in th...

Page 4: ... Install Cable Clamp 13 Figure 3 7 Central Stength Member Holder Installation 13 Figure 3 8 Install Adapter Patch Plate 14 Figure 3 9 Door Installation 14 Figure 3 10 Install Designation Labels 15 Figure 3 11 Install Mounting Brackets on LTX Panel 15 Figure 3 12 Install and Ground LTX Panel to the Rack 16 Figure 4 1 Secure IFC Cabling to the LTX Panel 17 Figure 4 2 Route Protected 2 Strand Ribbon ...

Page 5: ...gure 1 1 LTX Patch and Splice Panel with SC Adapters Dimensions and Weights Dimensions 7 H x 17 W x 17 D Weight 12 lbs Mechanical Connector type SC UPC SC APC LC APC LC UPC MPO MTP Access Front and Rear Capacity 288 port 4RU Splicing Mass Fusion Stranded Panel mounting 19 or 23 with ETSI EIA or WECO spacing Adapter access Patch Panel Material Aluminum Steel Compliance NEBS ETSI Zone 4 Seismic reli...

Page 6: ...NG Indicates a potentially hazardous situation which if not avoided could result in death or serious injury Telect assumes no liability from the application or use of these products Neither does Telect convey any license under its patent rights of others This document and the products described herein are subject to change without notice 1 2 About this Guide 1 3 Terminology Acronym Abbreviation Te...

Page 7: ...ber jumpers connect to adapters at the front LTX Patch and Splice Panel patch plates can accommodate SC UPC SC APC LC APC LC UPC are available in patch plates with 6 or 8 adapters LC SC available in patch plates with 12 adapters LC UPC and LC APC available in patch plates with 24 adapters MPO MTP feed through patch plates available with 6 or 8 adapters In addition Telect offers a special factory c...

Page 8: ... Telect Inc All rights reserved 148326 09 08 16 v2 1 509 926 6000 telect com 8 LTX Patch and Splice Panel LTX Patch and Splice Panel Fiber Install guide This page intentionally left blank ...

Page 9: ...ion such as Underwriter s Laboratories UL TUV etc ALERT Do not stand on fiber or fiber cables CAUTION These instructions presume you have verified that the Telect equipment being installed is compatible with the rest of the system including power ground circuit protection signal characteristics equipment from other vendors and local codes or ordinances When you receive the equipment carefully unpa...

Page 10: ...mum ambient temperature Tma specified by the manufacturer Mechanical Loading Mounting of the equipment in the rack should be such that a hazardous condition is not achieved due to uneven mechanical loading Reliable Earthing Reliable earthing of rack mounted equipment should be maintained Particular attention should be given to supply connections other than direct connections to the branch circuit ...

Page 11: ...ith routing spools velcro banding and stacked splice trays one or two cable clamp brackets with cable clamps front and rear doors designation cards for front and rear of the panel and an adapter patch plate panel with connectors and adapters LTX Patch and Splice Panel Side View Arc Arc Center Groove Arc Front View Arc Arc Door Door 3 1 2 Install Routing Spools Refer to Figure 3 2 for this procedur...

Page 12: ... to secure the trays to the platform 3 1 4 Install Tray Platform Refer to Figure 3 4 for this procedure The tray platform sits in the bottom center of the rear portion of the LTX panel The platform contains routing spools tray banding tie down slots and splice trays The tray platform can be rotated out from inside the LTX panel or can be removed for splicing 1 Position the tray platform on the bot...

Page 13: ...e inside of the cable clamp and remove enough bushing leaves so that the rubber cable clamp halves and remaining bushing leaves will fit snugly around the cable 3 Position cable clamp so that screw holes align in both clamp halves and the cable clamp bracket 4 Insert the two clamp screws to secure the clamp on the cable clamp bracket The bracket allows for some adjustment of the clamp as needed 5 ...

Page 14: ... Install Adapter Patch Plate Refer to Figure 3 8 for this procedure The Adapter Patch Plate installs at the front of the LTX Patch and Splice Panel The patch plate comes with adapters pre installed Pigtail fibers from the splice tray willl connect to connectors at the rear and fiber jumpers will connect to adapters at the front of the patch plate 1 Position the patch plate at the front of the LTX ...

Page 15: ... pigtail fiber connector side is marked REAR SIDE on the bottom corner NOTE After installing both designation labels ensure they are installed on the correct side of the LTX panel Figure 3 10 Install Designation Labels LTX Panel Clear Cover for Designation Label Door Refer to Figure 3 11 for this procedure The LTX panel mounting brackets are used to attach the LTX panel to a 19 or 23 EIA ETSI or W...

Page 16: ...ce panels adapt to standard 19 and 23 standard EIA ETSI or WECO racks 1 Position LTX Panel mounting bracket between rack panels aligning screw holes so that panel is in desired position 2 Insert four 12 24 thread forming screws supplied two on each side to secure the panel to the rack 3 If needed include a ground lug and star washer one ground lug with 14 AWG stranded wire per chassis 4 Tighten sc...

Page 17: ...ays cables are clamped and unprotected fiber ribbons are measured out and routed through the splice tray to splice sleeve holders At the rear of the LTX panel pigtail fiber strands route from connectors that attach to adapters with fiber jumpers at the front of the LTX panel The pigtail fibers route into the splice tray at the corner opposite to where the incoming IFC ribbon fibers route into the ...

Page 18: ...sure the diameter of the incoming IFC 2 If needed remove and discard leaves from the center of the cable clamp until the correct dimension the diameter of the IFC is obtained 3 Clamp remaining bushing halves of the cable clamp around the IFC The two rubber bushings fit the IFC riser plenum cable 4 1 2 Install IFC in the Cable Clamp Figure 4 1 Secure IFC Cabling to the LTX Panel IFC installs into c...

Page 19: ...ded band fibers together with velcro ties at protective tabs NOTE Take care to maintain a bend radius of no less than 7 inches as the fibers route through the tray 7 Continue to route the fibers to one of the bottom sleeve holders Place six individual fibers in individual grooved sleeves in the sleeve holder Fiber should not run all the way through the sleeve holder but should stop about halfway i...

Page 20: ...n connector with attached pigtail fiber at designated connector location and run pigtail fiber to the splice tray 3 Proceed to Section 4 1 6 Route Pigtail FIbers in the Splice Tray before installing the next pigtail fiber connector NOTE Each splice tray contains sleeve holder slots for 36 pigtail fibers Figure 4 5 Route Pigtail Fibers from Connectors Connector Locations Connect Pigtail Fibers Rout...

Page 21: ... individual pigtail fiber through the tray maintaining a bend radius of no less than 7 inches Keep the fiber beneath the protective tabs along the edge of the splice tray 3 Route the fiber through the tray around the sleeve holder position and into the corresponding sleeve holder about halfway so that fiber ends do not touch the IF fibers 4 For each fiber routed into the tray repeat this section u...

Page 22: ...e they are free of gel lint and debris b Splice fibers according to mass fusion splice machine manufacturer instructions c After splicing inspect splice for flaws If needed cut and re splice before adding splice sleeve 7 Re route the two spliced ribbons back in the splice tray to the splice sleeve holder in the same order as originally placed Refer to Section 4 1 4 Install Ribbon Fibers in the Spl...

Page 23: ...e fiber jumper being installed 3 Clean adapter port with oil free canned compressed air to remove any dust that has accummulated there 4 Remove the protective cover from the fiber jumper by pulling it straight out 5 Inspect the end of the fiber jumper for any dust or debris If needed clean the fiber with lint wipes and a commercial solution formulated for cleaning fiber surfaces or a reagent grade...

Page 24: ...ctors and adapters Telect recommends a commercially available system or solution Special formulation for cleaning fiber ferrules allows the commercial solvent to stay liquid long enough to dissolve impurities quickly and thoroughly yet evaporate quickly after wiping dry Always allow the ferrules to air dry thoroughly before reconnecting Canned air can be used to clean away debris initially but do ...

Page 25: ...owever Telect charges a processing fee You must submit a Purchase Order along with a Return Material Authorization RMA before returning equipment Call Telect for assistance in acquiring these forms The processing fee guarantees a repair estimate and is credited against actual material and labor costs Tag the equipment showing owner s name address and telephone number together with a detailed descr...

Page 26: ... Telect Inc All rights reserved 148326 09 08 16 v2 1 509 926 6000 telect com 26 LTX Patch and Splice Panel LTX Patch and Splice Panel Fiber Install guide This page intentionally left blank ...

Reviews: