1592006207 XB570L GB r1.1 26.08.2015
XB570L
13
OTHER
Adr Address for RS485:
1 to 247.
bUt Buzzer activation at the end of the cycle:
(0 to 60 sec; with 0 the buzzer is on till any key will be
pushed).
tPb Kind of probe:
it sets the kind of probe used.
ntC
=NTC,
PtC
=PTC.
rEL Release code (read only).
Ptb Parameter code (read only).
11. HOW A CYCLE IS DONE.
1. Every programmable cycle Cy1, Cy2, Cy3 or Cy4 can be divided into up to 3 phases usually called:
•
hard chill
•
soft chill
•
freezing cycle
2. For each phase there are 3 parameters:
iS1 (iS2, iS3):
set point related to the insert probes that stops the current phase.
rS1 (rS2, rS3):
set point of the room temperature for each phase.
Pd1 (Pd2, Pd3):
the maximum duration time for each phase.
Hds:
set point of the hold phase at the end of the whole cycle.
There are also 3 parameters:
CYS
to decide the kinf of cycle, by temperature or by time, and other two
related to the defrost. These are
dbC
(defrost before cycle) and
dbH
(defrost before holding, at the end of
the cycle).
CYS Cycle setting: tEP
=by temperature. The cycle is done according to the
rEM
parameter.
tiM
=timed
cycle, based on the Pd1, Pd2, Pd3 parameters.
dbc Defrost before the cycle:
n; Y.
iS1 Insert Probe Set point:
(-50 to 50, res. 1°C or 1°F) when the temperature measured by the three insert
probes reaches this value the first phase is ended.
rS1 Room probe Set point for the first phase:
(-50 to 50, res. 1°C or 1°F) it prevents temperature from
reaching a too low value during the hard cycle.
Pd1 Maximum time for first phase:
OFF to 4h00min, res. 10 min.
iS2 Insert probe set point:
(-50 to 50, res. 1°C or 1°F) when the temperature measured by the three insert
probes reaches this value the second phase is ended.
rS2 Room probe Set point:
(-50 to 50, res. 1°C or 1°F) for the second phase: it prevents temperature from
reaching a too low value during the second phase.
Pd2 Maximum time for second phase:
OFF to 4h00min, res. 10 min.
iS3 Insert Probe Set point:
(-50 to 50, res. 1°C or 1°F) to stop the third (and last) phase: when the
temperature measured by the three insert probes reaches this value the third phase is ended.
rS3 Room probe Set point:
(-50 to 50, res. 1°C or 1°F) for the third (and last) phase: it prevents
temperature from reaching a too low value during the third (and last) phase.
Pd3 Maximum time for the third phase:
OFF to 4h00min, res. 10 min.
dbH Defrost before the hold phase:
n; Y.
HdS Set point of the holding phase:
(-50 to 50, res. 1°C or 1°F) with “OFF” the hold phase is disabled.
IMPORTANT NOTE:
If the duration time of a phase is set at the OFF value, the corresponding phase is
disabled. For example, if
Pd3=OFF
the third phase of the cycle is not active.
By means the insert probe, the internal temperature of products can be checked. This measure is used to
end the various phase of the cycle. A special internal function detect if the inset probe is not used, in this
case the cycle is made by time.
11.1 CONFIGURABLE CYCLE PARAMETERS
11.2 HOW TO USE THE INSERT PROBES
Summary of Contents for BLC10
Page 1: ...BLAST CHILLER FREEZER User Manual PT SL 49 61 EN FR IT ES 3 13 25 37...
Page 2: ...2...
Page 9: ...9 QUICK GUIDE For the daily use...
Page 13: ...REFROIDISSEURS CONG LATEURS RAPIDES Manuel d utilisation PT SL 49 61 FR IT ES 13 25 37...
Page 14: ...14...
Page 21: ...21 GUIDE RAPIDE Guide rapide quotidien...
Page 25: ...ABBATTITORI CONGELATORI Manuale d uso PT SL 49 61 IT ES 25 37...
Page 26: ...26...
Page 33: ...33 33 GUIDA RAPIDA Guida pratica quotidiana...
Page 37: ...ABATIDORES CONGELADORES Manual del usuario PT SL 49 61 ES 37...
Page 38: ...38...
Page 45: ...45 GU A R PIDA Gu a r pida diaria...
Page 49: ...PT SL 49 61 ABATEDORES DE TEMPERATURA CONGELADORES Manual do utilizador...
Page 50: ...50...
Page 57: ...57 GUIA R PIDO Guia r pido di rio...
Page 61: ...SL 61 HLADILNIK ZAMRZOVALNIKA ZA HITRO HLAJENJE ZAMRZOVANJE Navodila za uporabo...
Page 62: ...62...
Page 69: ...69 HITRI VODNIK Za dnevno uporabo...
Page 73: ...1592006207 XB570L GB r1 1 26 08 2015 XB570L 2 20 XB590L XB570L...
Page 94: ...1593006207 XB570L FR r1 0 26 08 2015 XB570L 2 24 XB590L XB570L...
Page 118: ...1591006207 XB570L IT r1 1 26 08 2015 XB570L 2 24 XB590L XB570L...
Page 141: ...1591006207 XB570L IT r1 1 26 08 2015 XB570L 25 24...
Page 142: ...1594006207 XB570L SP r1 0 26 08 2015 XB570L 2 20 XB590L XB570L...
Page 162: ...XB590L XB570L...
Page 177: ...1592006207 XB570L GB r1 1 26 08 2015 XB570L 16 20 3 12 2 MONTAGEM...
Page 184: ...1592006207 XB570L GB r1 1 26 08 2015 XB570L 2 20 XB590L XB570L...