9.5.3 Updating the programme list (ISIPRO)
The ISIPRO programme list updating function ensures that
the programme list of your receiver will automatically be kept
up to date. To do this, a current programme list is broadcast
at regular intervals via satellite (ASTRA 19,2° East) and is
available to your receiver for downloading.
Should the parameters for the data channel used to downlo-
ad the programme list have changed, you can correct them
either in this menu or under Point 9.4.4 (manual programme
scan. The current transponder data can be obtained from
your authorised retailer. Generally, you should not make any
changes in this menu under normal circumstances.
>
Press
OK
to go to the sub-menu
Update program-
me list
(Fig. 9-25)
.
>
In order for your receiver to check automatically whet-
her a new progtramme list is available, mark the line
Update
.
>
Switch the automatic programme list updating function
to
on
by pressing the
OK
key.
>
To check manually for the availability of a new pro-
gramme list, press the
green
function key
Test
.
If a new programme list is available, a message will
be displayed
(Fig. 9-26).
>
To download the programme list, mark the field
Yes
and confirm by pressing
OK
.
Your receiver will then re-start, and will indicate the
availability of a new programme list by displaying a
message
(Fig. 9-27)
on screen.
>
If you do not wish to download the new programme
list, press the
red
function key
Reject
. The message
will only be displayed again when an even more up-to-
date programme list is transmitted.
Update programme list automatically
If you would like to have the updating of changes in the pro-
gramme list performed automatically, without any need for a
manual procedure, then you should select this option. The
changes will be implemented automatically. Newly found pro-
grammes will generally be added to the end of the Main
Favourites list.
>
To update the new programme list automatically, press
the
green
function key
Automatic
. The download
of the programme list will be started, and the progress
of the procedure can be followed on screen
(Fig. 9-28)
.
87
(Fig. 9-28)
(Fig. 9-26)
(Fig. 9-27)
(Fig. 9-25)
BED_ANL_DIGICORDER_S2_28/03.QXD 30.03.2006 11:38 Uhr Seite 87