3-23
Fig. 3.77
Fig. 3.76
Fig. 3.75
■
REASSEMBLING TORQUE
CONVERTER HOUSING
①
With a gasket, install the charging pump (1)
on the torque converter housing.
②
Install the strainer (1) on the converter
housing. With an “O”-ring (2) and gasket (3),
install the cover (4).
③
Install the converter relief valve (1) and
regulator valve (2) on the converter housing.
With a gasket (3), install the cover (4).
Summary of Contents for FD35C9
Page 2: ......
Page 4: ...Empty page...
Page 6: ...Empty page...
Page 8: ......
Page 44: ...2...
Page 112: ...2 68 Fig 2 182 Connect the hoses 2 to the lift cylinders 1 2...
Page 114: ...2...
Page 208: ...3 94 Fig 3 299 Remove the tapered roller bearing cup 2 from the hub 1...
Page 282: ...2...
Page 290: ......
Page 291: ......