Energier pro User Manual
36
6.4 Install the temperature sensor
6.5 Install the voltage sensor
Pull through the TS cable through gland and connect it on socket marked “BTS Interface”.
Please glue the temperature sensor, which was plugged into BTS socket at central panel, on the SIDE of battery and secure
the attachment.
Please notice the cable supplied is around 300cm. Do not pull cable too hard avoid loose contact loose.
Pull through the VS cable through gland and connect it on port marked “Voltage Sensor”. Please refer to following fig.
The minus (-) of voltage sensor should be connected to the minus (-) of service battery, and the positive (+) of voltage sensor
should be connected to the positive (+) of service battery. Wrong connection will damage the Energier pro bi-directional inverter.
Please secure the sensor on battery terminal.
Summary of Contents for Energier Pro Series
Page 1: ...User Manual Energier Pro series Bi directional inverter TBB Power CO ltd www tbbpower com A3 1...
Page 22: ...Energier pro User Manual 16 3 1 2 RCF remote 3 1 3 Vision Lite 3 1 4 AGS 3 1 5 TAI...
Page 25: ...Energier pro User Manual 19 3 2 4 AGS 3 2 5 TAI...
Page 39: ...Energier pro User Manual 33 CF 2000 VA 4000 VA Model CF 5000 VA 8000 VA Model...