OPERATING PROCEDURES
6-5
Model C303 & C314
Operating Procedures
6
17. Place the large O-ring into the door groove and lightly
lubricate.
Figure 6-18
Note:
Every four months or less, discard the O-rings
and install new O-rings.
18. Install the front bearing.
Do not
lubricate the front
bearing.
Figure 6-19
19. Install the freezer door. Position the door on the four
studs on the front of the freezing cylinder. Firmly
push the door into place. Install the four handscrews
on the studs and finger-tighten them equally in a
crisscross pattern to ensure that the door is snug.
Do
not
overtighten the handscrews.
Figure 6-20
20. Repeat step 1 through step 19 for the other freezing
cylinders.
Sanitizing
Important!
If a machine is sanitized and will not be
used for an extended period of time, clean water
should be used to flush all sanitizer from the lines.
Remove the water from all the lines and components
prior to storage of the unit. Upon return to service,
the unit must be sanitized prior to use.
1. Open the lighted display door. Place the control
switch in the ON position.
Figure 6-21
13092
Summary of Contents for C303
Page 14: ...3 4 SAFETY Model C303 C314 Safety 3 Notes...
Page 41: ...OPERATING PROCEDURES 6 13 Model C303 C314 Operating Procedures 6...
Page 43: ...7 2 OPERATOR CHECKLIST Model C303 C314 Operator Checklist 7 Notes...
Page 47: ...9 2 PARTS REPLACEMENT SCHEDULE Model C303 C314 Parts Replacement Schedule 9 Notes...
Page 53: ...11 4 LIMITED WARRANTY ON PARTS Model C303 C314 Limited Warranty on Parts 11 Notes...