background image

SHARED TO SHARED, Figure 1

1.

Post

2.

Privacy Screens

3.

Worksurface

screen definition (cont'd)

1

2

3

1

2

2

1

1

3

3

3

3

Figure 1

WORKSURFACE 66" & BELOW

WORKSURFACE  OVER 66"

9 Scene

MARCH 2016

Summary of Contents for Scene

Page 1: ...Scene installation guide March 2017...

Page 2: ...ost support 31 worksurface to worksurface flush support 32 low credenza to worksurface wide fixed supports 34 low credenza to worksurface fixed support 35 Storages 36 41 front inset spacer to high cre...

Page 3: ...ators in advance if necessary Site Preparation 1 Clear all obstacles that could interfere with the installation process 2 When doing a reconfiguration ensure that all furniture to be re used are clear...

Page 4: ...and marks use a commercial cleaner such as Cabinet or Countertop both manufactured by Magic American Corporation Acrylic Dust regularly to keep surfaces free of dust particles Clean any dirt with a da...

Page 5: ...1 1 1 1 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Figure 2 SHARED 2 SURFACES end shared shared post 1 1 1 1 1 1 1 1 1 1 1 1 1 1 post 1 1 1 1 1 1 post 2 Grommet hole 1 Pre drilled holes 2 2 2 2 IMPORTANT NOTES...

Page 6: ...ed post 1 1 1 1 post post 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 SHARED 4 SURFACES 2 Grommet hole 1 Pre drilled holes IMPORTANT NOTES Do not drill all the pre drilled holes drill only where r...

Page 7: ...END TO END Figure 1 1 Post 2 Privacy Screens 3 Worksurface screen definition Figure 1 1 2 3 1 1 1 2 3 7 Scene MARCH 2016...

Page 8: ...END TO SHARED Figure 2 1 Post 2 Privacy Screens 3 Worksurface screen definition cont d Figure 2 WORKSURFACE OVER 66 WORKSURFACE 66 BELOW 1 2 3 1 3 1 1 3 2 8 Scene MARCH 2016...

Page 9: ...SHARED TO SHARED Figure 1 1 Post 2 Privacy Screens 3 Worksurface screen definition cont d 1 2 3 1 2 2 1 1 3 3 3 3 Figure 1 WORKSURFACE 66 BELOW WORKSURFACE OVER 66 9 Scene MARCH 2016...

Page 10: ...t 4 Post cap 5 Post screen definition cont d 2 3 1 Figure 1 4 Figure 2 TACKBOARD FELT WHITEBOARD MELAMINE SCREEN 1 Screen extrusion 2 Tackboard Felt Whiteboard Melamine screen 3 Screen gasket 4 Post c...

Page 11: ...ACCESSORY SCREEN 1 Accessory screen 2 Post 3 Post cap screen definition cont d 2 1 Figure 3 3 11 Scene MARCH 2016...

Page 12: ...led instructions for planning with the Scene product line 1 Position all the storages Towers cabinets lateral files and cabinets 2 Assemble all worksurface supports gables and reinforcement bars insta...

Page 13: ...3 Install the posts to the surfaces Position all worksurfaces Mount them to the worksurface supports or credenza 4 Install the screens installation sequence cont d STEP 3 STEP 4 13 Scene MARCH 2016...

Page 14: ...support to worksurfaces Position the worksurfaces and mount it to worksurface or credenza 6 Position all spacers and mount them to credenza installation sequence cont d STEP 5 STEP 6 low credenza supp...

Page 15: ...ort to flag storage Position the flag storage and mount them to the surface 8 Position and mount the mounted storages installation sequence cont d STEP 7 STEP 8 flag storage flag support mounted stora...

Page 16: ...nted screen trough and trough mounted modesty 10 Install task lights cable management trough mounted receptacle and data Mount the accessories to accessory rails installation sequence cont d STEP 9 ST...

Page 17: ...orts or elevated surfaces with the topside facing up Place screen post in position shown in Figure 2 Use four screws 4 to attach the screen post to the surface screen post to surface IMPORTANT NOTES D...

Page 18: ...the worksurface Figure 1 2 Slide the bottom screen extrusion down the screen post Figure 2 For felt screen installation see felt screen to screen post screens to screen post measuring tape tools hardw...

Page 19: ...een post grooves Figure 3 Slide the gasket down the screen post until it bottoms out 4 Slide the screen into the gaskets within the posts Figure 4 screens to screen post cont d tools hardware needed F...

Page 20: ...sion on top of the screen 6 Repeat steps 3 to 5 until all screens are in position except accessory screen shown in Figure 5 screens to screen post cont d tools hardware needed FIGURE 5 FIGURE 6 measur...

Page 21: ...7 Place the post top caps and fillers as shown in Figure 7 screens to screen post cont d tools hardware needed FIGURE 7 measuring tape fillers top cap 21 Scene MARCH 2016...

Page 22: ...the bottom extrusion sideways Figure 1 2 Slide the appropriate screen gasket down the felt screen Figure 2 felt screen to screen post measuring tape tools hardware needed FIGURE 1 FIGURE 2 22 Scene MA...

Page 23: ...n down the screen post until it bottoms out Figure 3 4 Place the top screen extrusion on top of the screen Figure 4 felt screen to screen post measuring tape tools hardware needed FIGURE 3 FIGURE 4 23...

Page 24: ...5 Place the post top caps and fillers as shown in Figure 5 felt screen to screen post measuring tape tools hardware needed FIGURE 5 24 Scene MARCH 2016...

Page 25: ...d connector to the center gable with 1 4 20 1 inch quadrex pan head screw at the bottom Figure 1 and above Figure 2 3 Proceed to attach the other end of the reinforcement bar to the required gable too...

Page 26: ...nch quadrex pan head screws at the bottom Figure 1 and above Figure 2 3 Proceed to attach the other end of the reinforcement bar to the required gable end reinforcement bars to open end gable tools ha...

Page 27: ...2 Attach the no connector reinforcement bars tothe worksurface with 10 1 inch oval head screws Figure 2 no connector reinforcement bars to worksurface Figure 2 Figure 1 3 1 16 inches 3 1 16 inches 2...

Page 28: ...led secure the worksurface to the reinforcement beams with 10 1 inch oval head screws Figure 1 reinforcement beams to worksurface 2 Robertson long bit tools hardware needed drill Figure 1 10 1 oval he...

Page 29: ...e instructions for end reinforcement bars to open end gables Figure 1 short beam shown 2 Attach the the flag storage support with reinforcement to the bottom of the flag storage with 10 1 inch oval he...

Page 30: ...h 1 1 2 inch flat head screws through the mounting holes provided Figure 3 shows a flag worksurface on one side flag storage support cont d 2 Robertson long bit tools hardware needed drill Figure 3 1...

Page 31: ...e of the support plate to the edge of the surface Figure 1 D top shown 2 Secure the single post support with 10 1 inch oval head screws Figure 2 single post support Figure 1 Figure 2 11 1 4 inches 2 R...

Page 32: ...urfaces on top of the assembled supports Figure 1 2 Secure the worksurfaces together with flush plates and 10 1 inch oval head screws Figure 2 worksurface to worksurface flush plate Figure 2 Figure 1...

Page 33: ...and secure the remaining worksurfaces with flush plates and 10 1 inch oval head screws Figure 3 worksurface to worksurface flush plate 2 Robertson long bit tools hardware needed drill 10 1 oval head...

Page 34: ...rksurface above the credenza and secure the flush plates to the surface with 10 1 inch oval head screws Figure 2 3 Align the credenza to the worksurface low credenza to wide worksurface fixed supports...

Page 35: ...ch oval head screws Figure 1 2 Mount the worksurface above the credenza and secure the reinforcement beams to the surface Figure 2 low credenza to worksurface fixed support 2 Robertson long bit tools...

Page 36: ...ides of the drawer Figure 1 2 From the inside of the credenza drill through the top following the corresponding drilling points to match the required worksurface spacer Figure 2 front inset spacer to...

Page 37: ...in front 4 Secure the inset spacer to the credenza with 10 24 1 1 4 inch machine screws Figure 4 front inset spacer to high credenza installation cont d 2 Robertson long bit tools hardware needed dril...

Page 38: ...ts on the required worksurface depth Figure 1 2 Secure the worksurface to the high credenza with 10 24 1 1 4 inch machine screws Figure 2 worksurface to high credenza installation Figure 1 DRILL POINT...

Page 39: ...unted with 1 2 inch space at the front of the credenza flush on the sides and at the back Figure 2 credenza mounted storage to high credenza installation Figure 2 INSET SPACER HIGH CREDENZA CREDENZA M...

Page 40: ...mounting the wooden cleats on the wall listed in Figure 1 3 Level the wooden cleat and attach it to studs with 10 3 inch wood screws Figure 2 overhead storage attachment to dry wall with wood studs W...

Page 41: ...overhead storage unit and its contents Failure of the wall to support all imposed loads may result in property damage and or personal injury When in doubt the use of other methods of storage such as...

Page 42: ...into the accessory bar channels and push it down For the paper sorter angle it at 30 degrees place the hooks at their desired location into the accessory bar channels release them down and the paper...

Page 43: ...igure 1 2 Attach the surface mounted screen to the underside of the worksurface using 10 1 oval head screws Figure 2 surface mounted screen measuring tape tools hardware needed drill 2 Robertson long...

Page 44: ...desty screen to the wire management trough using 1 4 20 round head screws with three washers on each screw Figure 1 trough mounted modesty screen measuring tape tools hardware needed drill 2 Robertson...

Page 45: ...ough 1 Ensure the worksurface is properly supported and all brackets are secured 2 Position the worksurface wire management trough at the specified location Figure 1 Use 10 1 oval head screws to attac...

Page 46: ...efore beginning installation if the ceiling tile is acoustical remove the tile above the power pole before attaching the power pole to the bracket Figure 2 3 Attach half of the power pole to the brack...

Page 47: ...power pole together Figure 3 5 Place the ceiling collar around the management column and mount to the cieling with 6 screws Figure 4 drill 2 Robertson long bit tools hardware needed 10 11 16 oval hea...

Page 48: ...ommunication access below the worksurface level 1 Insert the bottom edge of the trough mounted communication box Figure 1 2 Secure in place with 6 3 8 metal screws Figure 2 NOTES The trough mounted co...

Page 49: ...r box before installation Figure 1 2 Mount the trough mounted power box to the horizontal wire management trough with 6 5 8 metal screws Figure 2 drill 2 Robertson long bit tools hardware needed NOTES...

Page 50: ...MARCH 2017 SCENE 2 tayco com 0317...

Reviews: