The following application guidelines
provide detailed instructions for
planning with the Scene product line.
1.
Position all the storages
(Towers, cabinets, lateral files
and cabinets).
2.
Assemble all worksurface
supports (gables and
reinforcement bars).
installation sequence
STEP 1
STEP 2
12 Scene
MARCH 2016