![Tatuus GB3 CHAMPIONSHIP Technical Manual Download Page 79](http://html1.mh-extra.com/html/tatuus/gb3-championship/gb3-championship_technical-manual_3706899079.webp)
Version 1.03
80
8.4
P
OWERBOX
The PSD9 powerbox manage the current distribution on the following power lines:
1.
Fuel Pump
2.
Rain light
3.
DAQ/ECU/GCU
4.
Engine valves
5.
Aux
6.
Coils, injectors
7.
Coils, injectors (redundant)
8.
Starter A
9.
Starter B
The powerbox cuts current supply in case of over-load, the system can be reset with a power cycle but current
cut will re-occur if problem persists.
User devices connected to customer available connections (Front/Rear CAN extension, PTT Interface)
must
not
exceed 5A in total and 2A per power supply pin.
WARNING: Do not disconnect the powerbox connection when power is ON!
Diagnostic and functional information are available in the logger system see chapter for details.
Refer to attached pdf files for electrical schematics.
Summary of Contents for GB3 CHAMPIONSHIP
Page 1: ...TECHNICAL MANUAL Part A TATUUS MSV 023 Release 1 03 27 02 2023 ...
Page 11: ...Version 1 03 12 1 4 OVERALL DIMENSIONS ...
Page 21: ...Version 1 03 22 ...
Page 36: ...Version 1 03 37 3 2 SETUP TOOLS Here below some views of the main reference points ...
Page 44: ...Version 1 03 45 An aluminium heel rest plate can be added here below a guideline sketch ...