Installing the Equipment
Reference Guide: evolution 5000 E5780 and E5782 Encoder
Page 2-17
ST.RE.E10135.4
2.7 Powering
Up/Down
2.7.1
Before Powering Up
Before powering up the Encoder, check that:
1.
The unit has been installed in a suitable location.
2.
The unit has been connected to external equipment and power supply, as required.
3.
The power supply has been checked and a good earth provided.
4.
The correct fuse type and rating has been fitted to the equipment and, for the a.c. supply
version, the a.c. power cable.
2.7.2 Powering
Up
To power up the Encoder:
1.
Turn on the local power supply. The Encoder executes a series of power-up initialisation
and self-test routines.
2.
Confirm that the green Power LED is lit and that the red Alarm LED is unlit.
3.
Ensure that the Stand-by switch is set to On (see
Chapter 1, Introduction, Figure 1.2
).
After the boot period the Encoder start-up screen is displayed.
NOTES…
1.
The fans on the Encoder can be temperature controlled so may not be on if the ambient
temperature is low. Refer to Annex B, Technical Specification for more information.
2.
During initialisation invalid PIDs may appear momentarily in the transport stream.
2.7.3 Powering
Down
To power down the Encoder remove the power supply connection at the rear of the unit.
2.8
Setting the Encoder IP Address
2.8.1
Methods of Changing the Encoder IP Address
If, for any reason, the IP address has to be changed, this can be achieved via the front panel
menus (see
Section 4.4.4 Remote Control Menu
). The user may also set the network mask.
NOTE…
The new IP address is only accepted after the Encoder is repowered.