Tandberg Data M-Series Installation Guide
Document T6423046-02 A01
February 2004
Installing a Rack Mount Library
21
8
a
Position a front shelf clamp (PN 215812) at the front of the front left
rack rail, with the bottom of the clamp approximately 15.5 inches (394
millimeters) above the bottom of the rack mount shelf.
b
Position a clamp strip (PN 217405) behind the front left rack rail,
aligning it with the front shelf clamp.
c
Insert a screw (PN YS42064) through the upper hole in the front shelf
clamp, through the rack rail, and into the upper hole in the clamp
strip.
d
Insert a screw (PN YS42064) through the bottom hole in the front
shelf clamp, through the rack rail, and into the bottom hole in the
clamp strip.
e
Repeat steps
through
to install the front shelf clamp and clamp
strip on the right rack rail.
Figure 18 Installing the
Clamp Strips
Caution:
The top of the front shelf clamp must be no more than 580
mm above the bottom of the rack mount shelf.
Front shelf clamp
Clamp strip