![background image](http://html1.mh-extra.com/html/takeuchi/tb1160w/tb1160w_operators-manual_3334848005.webp)
0-3
FRONT, REAR, LEFT AND RIGHT
MACHINE DESCRIPTION
Equipped with outrigger
DESIGNATED OPERATIONS
Use this machine primarily for the following
operations:
• Excavation
• Digging ditches
• Leveling
• Loading
FEATURES
• Hydromounted cab minimizes vibration
• Low engine noise and exhaust emissions
• Electronic control of auxiliary hydraulic
circuit
• Automatic and manual operation for engine
deceleration
• Engine emergency stop system
BREAK-IN PERIOD
When the machine is new, operate the
machine for the first 100 hours (as indicated
on the hour meter) by following the
instructions below.
Using a new machine without a break-in
period will lead to quicker deterioration of
machine performance and may shorten the
machine’s service life.
• Sufficiently warm up the engine and
hydraulic oil.
• Avoid heavy loads and rapid operations.
Operate with a load of about 80% the
maximum load.
• Do not abruptly start up, accelerate,
change directions, or stop unless
necessary.
This manual refers the front, rear, left and
right of the machine as seen when sitting in
the operator’s seat with the steering device
visible to the front.
Summary of Contents for TB1160W
Page 1: ......
Page 11: ...1 1 SAFETY...
Page 50: ...1 40 SAFETY SAFETY SIGNS DECALS...
Page 51: ...1 41 SAFETY SAFETY SIGNS DECALS...
Page 52: ...1 42 SAFETY SAFETY SIGNS DECALS...
Page 53: ...2 1 CONTROLS...
Page 127: ...3 1 OPERATION...
Page 133: ...3 7 MEMO...
Page 158: ...3 32...
Page 159: ...4 1 TRANSPORT...
Page 163: ...4 5 TRANSPORT Hoisting posture HOISTING THE MACHINE...
Page 166: ...4 8...
Page 167: ...5 1 MAINTENANCE...
Page 246: ...5 80...
Page 247: ...6 1 TROUBLESHOOTING...
Page 249: ...6 3 MEMO...
Page 257: ...6 11 MEMO...
Page 273: ...7 1 SPECIFICATIONS...
Page 275: ...7 3 MEMO...
Page 276: ...7 4 SPECIFICATIONS MACHINE DIMENSIONS MACHINE DIMENSIONS...
Page 278: ...7 6 SPECIFICATIONS OPERATING RANGES 2 Piece boom OPERATING RANGES...
Page 280: ...7 8 MEMO...
Page 282: ...7 10 SPECIFICATIONS 2 Piece boom 2570 mm 101 2 in arm LIFTING CAPACITIES...
Page 283: ...7 11 SPECIFICATIONS 2 Piece boom 2570 mm 101 2 in arm LIFTING CAPACITIES...
Page 284: ...7 12...
Page 285: ...8 1 OPTIONS...
Page 291: ...8 7 MEMO...