![background image](http://html1.mh-extra.com/html/takeuchi/tb1160w/tb1160w_operators-manual_3334848208.webp)
5-42
MAINTENANCE
EVERY 250 HOURS
CLEANING THE COOLER FINS
• Wear required appropriate equipment
such as protective goggle and filter
mask when using compressed air, as
metal fragments or other objects can fly
and cause serious injury.
• Before performing maintenance on top
of the work bench, clean the footing and
observe the following precautions to
prevent falling.
· Do not spill oil or grease.
· Do not leave tools scattered around.
· Watch your step when walking.
• Never jump down from the machine or
the work bench. When getting on or off
the machine or work bench, use the
steps, handrails or work bench to
support your body. Your weight should
be evenly distributed among the three
contact points (one hand and two feet
or two hands and one foot).
• Do not stand on the dozer blade and
perform maintenance work. Doing so is
dangerous because of the unsteady
foothold. Use the work bench.
IMPORTANT: Be careful not to damage
the fins when cleaning.
• When using compressed air or
pressurized water, make sure the
pressure is no higher than 200 kPa (28
psi) and hold the nozzle sufficiently
away from the fins.
IMPORTANT: When using water, cover the
electrical system to prevent water from
getting in.
IMPORTANT: When operating the
machine in very dusty places, perform
inspection and maintenance operations
every day.
1. Open the left side cover and the engine
hood.
2. Blow compressed air on the fins to
remove mud and dirt stuck on them.
Summary of Contents for TB1160W
Page 1: ......
Page 11: ...1 1 SAFETY...
Page 50: ...1 40 SAFETY SAFETY SIGNS DECALS...
Page 51: ...1 41 SAFETY SAFETY SIGNS DECALS...
Page 52: ...1 42 SAFETY SAFETY SIGNS DECALS...
Page 53: ...2 1 CONTROLS...
Page 127: ...3 1 OPERATION...
Page 133: ...3 7 MEMO...
Page 158: ...3 32...
Page 159: ...4 1 TRANSPORT...
Page 163: ...4 5 TRANSPORT Hoisting posture HOISTING THE MACHINE...
Page 166: ...4 8...
Page 167: ...5 1 MAINTENANCE...
Page 246: ...5 80...
Page 247: ...6 1 TROUBLESHOOTING...
Page 249: ...6 3 MEMO...
Page 257: ...6 11 MEMO...
Page 273: ...7 1 SPECIFICATIONS...
Page 275: ...7 3 MEMO...
Page 276: ...7 4 SPECIFICATIONS MACHINE DIMENSIONS MACHINE DIMENSIONS...
Page 278: ...7 6 SPECIFICATIONS OPERATING RANGES 2 Piece boom OPERATING RANGES...
Page 280: ...7 8 MEMO...
Page 282: ...7 10 SPECIFICATIONS 2 Piece boom 2570 mm 101 2 in arm LIFTING CAPACITIES...
Page 283: ...7 11 SPECIFICATIONS 2 Piece boom 2570 mm 101 2 in arm LIFTING CAPACITIES...
Page 284: ...7 12...
Page 285: ...8 1 OPTIONS...
Page 291: ...8 7 MEMO...