![background image](http://html1.mh-extra.com/html/takeuchi/tb1160w/tb1160w_operators-manual_3334848204.webp)
5-38
MAINTENANCE
AFTER THE INITIAL 250
HOURS (ONLY FOR NEW
MACHINES)
REPLACING THE SLEW MOTOR GEAR OIL
• Stop the engine and allow each part of
the machine to cool down before
performing maintenance.
· The slew motor is hot immediately
after the engine is stopped. Touching
it will cause burns.
· The gear oil is also hot and under high
pressure immediately after the engine
is stopped.
Be careful not to touch the oil when
loosening the plug. Working on the
machine under these conditions could
result in burns or injuries.
• When performing maintenance on the
machine, clean up the foot area and
strictly observe the following so as not
to fall:
· Do not spill oil or grease.
· Do not leave tools scattered around.
· Watch your step when walking.
• Never jump down from the machine.
Use the steps and handrails when
climbing up and down the machine, and
always support your body at three
points with your hands and feet.
• The pressure in the reduction gear case
of slew motor may cause oil or the cap
to fly out. Loosen the cap slowly to
release the pressure.
AFTER THE INITIAL 250 HOURS (ONLY FOR NEW MACHINES)
1. Remove the cap (2).
2. Place a pan under the hose (3) to catch
the waste oil.
3. Loosen the drain valve (4) and drain the
oil.
4. Tighten the drain valve (4).
5. Add oil up to the upper limit (H) of the level
gauge (1).
Problems could arise if the oil level is either
too low to too high.
6. Tighten the cap (2).
Summary of Contents for TB1160W
Page 1: ......
Page 11: ...1 1 SAFETY...
Page 50: ...1 40 SAFETY SAFETY SIGNS DECALS...
Page 51: ...1 41 SAFETY SAFETY SIGNS DECALS...
Page 52: ...1 42 SAFETY SAFETY SIGNS DECALS...
Page 53: ...2 1 CONTROLS...
Page 127: ...3 1 OPERATION...
Page 133: ...3 7 MEMO...
Page 158: ...3 32...
Page 159: ...4 1 TRANSPORT...
Page 163: ...4 5 TRANSPORT Hoisting posture HOISTING THE MACHINE...
Page 166: ...4 8...
Page 167: ...5 1 MAINTENANCE...
Page 246: ...5 80...
Page 247: ...6 1 TROUBLESHOOTING...
Page 249: ...6 3 MEMO...
Page 257: ...6 11 MEMO...
Page 273: ...7 1 SPECIFICATIONS...
Page 275: ...7 3 MEMO...
Page 276: ...7 4 SPECIFICATIONS MACHINE DIMENSIONS MACHINE DIMENSIONS...
Page 278: ...7 6 SPECIFICATIONS OPERATING RANGES 2 Piece boom OPERATING RANGES...
Page 280: ...7 8 MEMO...
Page 282: ...7 10 SPECIFICATIONS 2 Piece boom 2570 mm 101 2 in arm LIFTING CAPACITIES...
Page 283: ...7 11 SPECIFICATIONS 2 Piece boom 2570 mm 101 2 in arm LIFTING CAPACITIES...
Page 284: ...7 12...
Page 285: ...8 1 OPTIONS...
Page 291: ...8 7 MEMO...