![background image](http://html1.mh-extra.com/html/takeuchi/tb1160w/tb1160w_operators-manual_3334848217.webp)
5-51
MAINTENANCE
EVERY 500 HOURS
INSPECTING THE HUB GEAR OIL
• Stop the engine and allow each part of
the machine to cool down before
performing maintenance.
· The hubs are hot immediately after the
engine is stopped. Touching them will
cause burns.
· The gear oil is also hot and under high
pressure immediately after the engine
is stopped.
Be careful not to touch the oil when
loosening the plugs. Working on the
machine under these conditions could
result in burns or injuries.
• The pressure in the reduction gear case
of hubs may cause oil or the plug to fly
out. Loosen the plug slowly to release
the pressure.
1. Park the machine on a level surface and
stop the engine.
2. Set the hub so that the plug (1) is in a level
position.
3. Remove the plug (1).
4. If oil is left on your finger when it is inserted
through the hole, the oil level is proper.
5. If the level is too low, add oil through the
hole of the plug (1) until the oil flows from
the hole.
6. Install the plug (1) and tighten it.
·
Tightening torque: 50 N·m (36.9 ft-lb.)
Summary of Contents for TB1160W
Page 1: ......
Page 11: ...1 1 SAFETY...
Page 50: ...1 40 SAFETY SAFETY SIGNS DECALS...
Page 51: ...1 41 SAFETY SAFETY SIGNS DECALS...
Page 52: ...1 42 SAFETY SAFETY SIGNS DECALS...
Page 53: ...2 1 CONTROLS...
Page 127: ...3 1 OPERATION...
Page 133: ...3 7 MEMO...
Page 158: ...3 32...
Page 159: ...4 1 TRANSPORT...
Page 163: ...4 5 TRANSPORT Hoisting posture HOISTING THE MACHINE...
Page 166: ...4 8...
Page 167: ...5 1 MAINTENANCE...
Page 246: ...5 80...
Page 247: ...6 1 TROUBLESHOOTING...
Page 249: ...6 3 MEMO...
Page 257: ...6 11 MEMO...
Page 273: ...7 1 SPECIFICATIONS...
Page 275: ...7 3 MEMO...
Page 276: ...7 4 SPECIFICATIONS MACHINE DIMENSIONS MACHINE DIMENSIONS...
Page 278: ...7 6 SPECIFICATIONS OPERATING RANGES 2 Piece boom OPERATING RANGES...
Page 280: ...7 8 MEMO...
Page 282: ...7 10 SPECIFICATIONS 2 Piece boom 2570 mm 101 2 in arm LIFTING CAPACITIES...
Page 283: ...7 11 SPECIFICATIONS 2 Piece boom 2570 mm 101 2 in arm LIFTING CAPACITIES...
Page 284: ...7 12...
Page 285: ...8 1 OPTIONS...
Page 291: ...8 7 MEMO...