3-20
OPERATION
Do not drive piles with the bucket or dig
by banging the bucket
OPERATING PROCEDURES
Putting excessive strain on the machine will
shorten its service life. When digging, use the
hydraulic force of the cylinders and the
shallow and long strokes.
For hard base rock, break the rock up into
small pieces with a breaker, etc., before
digging. This prevents damage to the
machine and is thus more economical in the
end.
Caution on exposing the dozer blade to
shocks
Doing so will shorten the service life of the
hoe attachment. Use the hydraulic force to
dig.
Do not perform operations using the
machine’s dropping force
Digging bedrock
Hitting the dozer blade against rocks, etc.,
could damage the dozer blade or the blade
cylinder.
Summary of Contents for TB1160W
Page 1: ......
Page 11: ...1 1 SAFETY...
Page 50: ...1 40 SAFETY SAFETY SIGNS DECALS...
Page 51: ...1 41 SAFETY SAFETY SIGNS DECALS...
Page 52: ...1 42 SAFETY SAFETY SIGNS DECALS...
Page 53: ...2 1 CONTROLS...
Page 127: ...3 1 OPERATION...
Page 133: ...3 7 MEMO...
Page 158: ...3 32...
Page 159: ...4 1 TRANSPORT...
Page 163: ...4 5 TRANSPORT Hoisting posture HOISTING THE MACHINE...
Page 166: ...4 8...
Page 167: ...5 1 MAINTENANCE...
Page 246: ...5 80...
Page 247: ...6 1 TROUBLESHOOTING...
Page 249: ...6 3 MEMO...
Page 257: ...6 11 MEMO...
Page 273: ...7 1 SPECIFICATIONS...
Page 275: ...7 3 MEMO...
Page 276: ...7 4 SPECIFICATIONS MACHINE DIMENSIONS MACHINE DIMENSIONS...
Page 278: ...7 6 SPECIFICATIONS OPERATING RANGES 2 Piece boom OPERATING RANGES...
Page 280: ...7 8 MEMO...
Page 282: ...7 10 SPECIFICATIONS 2 Piece boom 2570 mm 101 2 in arm LIFTING CAPACITIES...
Page 283: ...7 11 SPECIFICATIONS 2 Piece boom 2570 mm 101 2 in arm LIFTING CAPACITIES...
Page 284: ...7 12...
Page 285: ...8 1 OPTIONS...
Page 291: ...8 7 MEMO...