TP350 User’s Manual
2-4.
Confirm Run
When the user is happy with the profile parameters just click on the tick. A run
review screen will now be shown with a text description of the profile steps. Click
on OK to commence run execution.
Once the profile is confirmed, if the ‘Use Top Heater’ checkbox option is selected
(default) then you will be prompted with a screen asking if you wish to wait for the
top heater or reach target temperature before commencing the run. If you select to
wait for the top heater to achieve temperature a waiting screen will be displayed.
You may skip the waiting step at any time if you wish to commence the run
immediately. Depending on the set temperature of the Top Heater it will take up to
several minutes to preheat to this temperature.
v.2.01
20