Y-6
Y-6
Assembly Adjustment (Crane Operation)
50
WY05-3911E
2.3 Shim adjustment at sides
of the boom bottom
(section [2] indicated in Figure 1)
1. Measure the inner dimension of the outer boom
box at the sliding position of the slide plates at
approximately 1.5 m (4.92 ft) from the boom
bottom.
2. Then, divide the dimension evenly between right
and left sides, and insert shims so that the gaps
become the minimum clearance.
[NOTICE]
If the boom cannot be inserted, measure the inner
dimension of the outer boom box at the boom
bottom.
3. Apply a thread locking agent (ThreeBond 1401 or
the equivalent) to the fixing bolt. Lightly tighten it
and then untighten it for 1/4 turns.
Standard number of shims
Remarks
1.0-mm thick 0.6-mm thick
2nd boom
2
0
If the total thickness of shims in a single side is 4 mm (0.16 in) or
more, make sure to use the slide plate with the thickness of 19
mm (0.75 in) (standard: 15 mm (0.59 in)).
3rd boom
3
0
4th boom
3
0
5th boom
2
1
Top boom
3
1
Left Right
Summary of Contents for GR-700N
Page 1: ......
Page 8: ...7 WA04 4651E 6 Group index System Diagrams Data Adjustment and Checks Y Z Y Z...
Page 132: ...Z 6 Z 6 Hydraulic Parts Location Diagram Upper 28 WZ07 3531E 5 Return 4 343 463 53000...
Page 133: ...Z 6 Z 6 Hydraulic Parts Location Diagram Upper 29 WZ07 3531E 6 Drain Detail A 5 343 463 55000...
Page 134: ...Z 6 Z 6 Hydraulic Parts Location Diagram Upper 30 WZ07 3531E 7 Gauge 0 343 463 56000...
Page 135: ...Z 6 Z 6 Hydraulic Parts Location Diagram Upper 31 WZ07 3531E 8 Pilot 3 343 463 57000...
Page 139: ...35 WZ07 3531E Z 6 Z 6 Hydraulic Parts Location Diagram Upper 14 Jib main unit 2 343 463 43000...
Page 193: ...89 WZ03 7090E Z 14 Z 14 View System 3 3 Cable B 0 343 818 40450...
Page 199: ...95 WZ03 7090E Z 14 Z 14 View System 4 Screen selection switch 0 343 546 51800...