Y-6
Y-6
Assembly Adjustment (Crane Operation)
46
WY05-3911E
Adjusting top end upper slide plate (3rd boom section to 5th boom section)
1. Make adjustments with each of the boom sections from 4th through top boom fully retracted by the No.3
boom telescoping cylinder.
2. After making the above adjustment, retighten the each of the adjustment bolts in the upper section and in the
side by 1/4 turns, and then fix by using the nuts (both left and right).
3. Lastly, tighten the fixing bolt to the tightening torque of 36 to 40 N-m {370 to 410 kgf-cm} (27 to 30 ft-lbf),
then bend the washer plate to stop the bolt from turning. (If the washer plate does not come to the
appropriate position at the specified torque, position the washer plate to the tightening direction.)
1.2 Adjusting boom head lower slide plate
Refer to the descriptions in "2.4 Shim adjustment at lower part of boom head" of "2. Adjusting clearance for
the boom".
Nut
Adjustment bolt (upper)
Fixing bolt
Washer plate
Adjustment bolt
(side)
Retainer
Slide plate
Nut
Summary of Contents for GR-700N
Page 1: ......
Page 8: ...7 WA04 4651E 6 Group index System Diagrams Data Adjustment and Checks Y Z Y Z...
Page 132: ...Z 6 Z 6 Hydraulic Parts Location Diagram Upper 28 WZ07 3531E 5 Return 4 343 463 53000...
Page 133: ...Z 6 Z 6 Hydraulic Parts Location Diagram Upper 29 WZ07 3531E 6 Drain Detail A 5 343 463 55000...
Page 134: ...Z 6 Z 6 Hydraulic Parts Location Diagram Upper 30 WZ07 3531E 7 Gauge 0 343 463 56000...
Page 135: ...Z 6 Z 6 Hydraulic Parts Location Diagram Upper 31 WZ07 3531E 8 Pilot 3 343 463 57000...
Page 139: ...35 WZ07 3531E Z 6 Z 6 Hydraulic Parts Location Diagram Upper 14 Jib main unit 2 343 463 43000...
Page 193: ...89 WZ03 7090E Z 14 Z 14 View System 3 3 Cable B 0 343 818 40450...
Page 199: ...95 WZ03 7090E Z 14 Z 14 View System 4 Screen selection switch 0 343 546 51800...