Y-6
Y-6
Assembly Adjustment (Crane Operation)
44
WY05-3911E
Y-6 Assembly Adjustment
(Crane Operation)
1. Adjusting boom telescoping wire ropes
1.1 Adjusting boom telescoping wire ropes
1. Lower the fully retracted boom to horizontal.
2. Evenly tighten the adjustment nuts A (2 points) of
the 5th boom section extension wire rope, so that
the 5th boom section is slightly (1 to 5 mm (0.04
to 0.2 in)) away from the 4th boom section.
3. Evenly tighten the adjustment nuts B (2 points) of
the top boom section extension wire rope until the
top boom section is slightly (1 to 5 mm (0.04 to
0.2 in)) away from the 5th boom section.
Summary of Contents for GR-700N
Page 1: ......
Page 8: ...7 WA04 4651E 6 Group index System Diagrams Data Adjustment and Checks Y Z Y Z...
Page 132: ...Z 6 Z 6 Hydraulic Parts Location Diagram Upper 28 WZ07 3531E 5 Return 4 343 463 53000...
Page 133: ...Z 6 Z 6 Hydraulic Parts Location Diagram Upper 29 WZ07 3531E 6 Drain Detail A 5 343 463 55000...
Page 134: ...Z 6 Z 6 Hydraulic Parts Location Diagram Upper 30 WZ07 3531E 7 Gauge 0 343 463 56000...
Page 135: ...Z 6 Z 6 Hydraulic Parts Location Diagram Upper 31 WZ07 3531E 8 Pilot 3 343 463 57000...
Page 139: ...35 WZ07 3531E Z 6 Z 6 Hydraulic Parts Location Diagram Upper 14 Jib main unit 2 343 463 43000...
Page 193: ...89 WZ03 7090E Z 14 Z 14 View System 3 3 Cable B 0 343 818 40450...
Page 199: ...95 WZ03 7090E Z 14 Z 14 View System 4 Screen selection switch 0 343 546 51800...