ii
Y-4 Air Bleeding Procedure ................. 25
1. Hydraulic pump ....................................... 25
1.1 Steering and ACC charging pump
(double gear pump) ............................ 25
1.2 Main pump ................................................ 25
1.3 Main pump (when the tank pressurization
tool is used) ........................................ 26
1.4 Tank pressurization tool ........................... 26
1.5 Other (cylinder) ......................................... 26
2. Winch brake ............................................ 27
3. Service brake .......................................... 28
4. Hydraulic motor assy .............................. 29
4.1 Slewing motor ........................................... 29
4.2 Winch motor ............................................. 29
4.3 Other motor .............................................. 29
5. Winch counterbalance valve
(main and auxiliary) ..................... 30
6. Jib tilt cylinder ......................................... 30
7. Pilot circuit
(hydraulic pilot control valve) ....... 31
8. Positive control circuit ............................. 32
9. Slewing control valve
(back-pressure valve) .................. 32
10. Hydraulic valve (winch brake) ................. 33
Y-5 Adjusting Procedure (Electric) ...... 34
1. Switch adjustment procedure .................. 34
1.1 Over-front detection switch (CN521) ........ 34
1.2 Boom full retraction detection switch
(CN552) .............................................. 34
1.3 Jib lock pin detection switch (CN573) ....... 35
1.4 Jib connection pin detection switch
(CN572) .............................................. 35
1.5 Jib full retraction detection switch
(CN554) .............................................. 36
1.6 Main wire rope length detection
(Phase A: CN525)
(Phase B: CN526) ............................... 37
1.7 Aux. wire rope length detection
(Phase A: CN527)
(Phase B: CN528) ............................... 37
1.8 Straight ahead detection switch
(CN408) .............................................. 38
1.9 Rear steering lock pin IN detection
switch (CN417) ................................... 38
1.10 Rear steering lock pin OUT detection
switch (CN418) ................................... 38
1.11 Vehicle height detection ............................ 39
1.11.1 Assembly adjustment .......................... 39
1.11.2 Switch adjustment
(front left: CN400, CN401)
(rear left: CN404, CN405) ................... 42
1.11.3 Switch adjustment
(front right: CN402, CN403)
(rear right: CN406, CN407) ................. 43
Y-6 Assembly Adjustment
(Crane Operation) .................. 44
1. Adjusting boom telescoping wire ropes ... 44
1.1 Adjusting boom telescoping wire ropes .... 44
1.2 Adjusting boom head lower slide plate ..... 46
1.3 Adjusting wire rope
for 5th boom section extension ........... 47
Summary of Contents for GR-700N
Page 1: ......
Page 8: ...7 WA04 4651E 6 Group index System Diagrams Data Adjustment and Checks Y Z Y Z...
Page 132: ...Z 6 Z 6 Hydraulic Parts Location Diagram Upper 28 WZ07 3531E 5 Return 4 343 463 53000...
Page 133: ...Z 6 Z 6 Hydraulic Parts Location Diagram Upper 29 WZ07 3531E 6 Drain Detail A 5 343 463 55000...
Page 134: ...Z 6 Z 6 Hydraulic Parts Location Diagram Upper 30 WZ07 3531E 7 Gauge 0 343 463 56000...
Page 135: ...Z 6 Z 6 Hydraulic Parts Location Diagram Upper 31 WZ07 3531E 8 Pilot 3 343 463 57000...
Page 139: ...35 WZ07 3531E Z 6 Z 6 Hydraulic Parts Location Diagram Upper 14 Jib main unit 2 343 463 43000...
Page 193: ...89 WZ03 7090E Z 14 Z 14 View System 3 3 Cable B 0 343 818 40450...
Page 199: ...95 WZ03 7090E Z 14 Z 14 View System 4 Screen selection switch 0 343 546 51800...