Y-8
Y-8
Operation Check (Crane Operation)
74
WY05-3930E
4. Hoisting
[Condition]
• L
oad
: None
•
Engine speed : Approximately 700 min
-1
to medium speed
[Procedure]
1. Shift the telescoping lever to full stroke first.
2. Make sure that the main winch moves slowly
while the auxiliary winch lever is slightly operated.
3. Make sure that the main winch does not move
while the auxiliary winch lever is operated to full
stroke.
5. Backward stability control
[NOTICE]
Extend the outrigger, and set up the machine
horizontally.
1. Select the on-rubber for outrigger set status on
the AML.
2. The boom raising operation must be stopped at
73° automatically.
However, while the boom length is 9.8 m (32.1 ft)
and the over-front detection switch is OFF, the
boom raising operation must be stopped at 60°
automatically.
3. The boom lowering must be available.
Summary of Contents for GR-700N
Page 1: ......
Page 8: ...7 WA04 4651E 6 Group index System Diagrams Data Adjustment and Checks Y Z Y Z...
Page 132: ...Z 6 Z 6 Hydraulic Parts Location Diagram Upper 28 WZ07 3531E 5 Return 4 343 463 53000...
Page 133: ...Z 6 Z 6 Hydraulic Parts Location Diagram Upper 29 WZ07 3531E 6 Drain Detail A 5 343 463 55000...
Page 134: ...Z 6 Z 6 Hydraulic Parts Location Diagram Upper 30 WZ07 3531E 7 Gauge 0 343 463 56000...
Page 135: ...Z 6 Z 6 Hydraulic Parts Location Diagram Upper 31 WZ07 3531E 8 Pilot 3 343 463 57000...
Page 139: ...35 WZ07 3531E Z 6 Z 6 Hydraulic Parts Location Diagram Upper 14 Jib main unit 2 343 463 43000...
Page 193: ...89 WZ03 7090E Z 14 Z 14 View System 3 3 Cable B 0 343 818 40450...
Page 199: ...95 WZ03 7090E Z 14 Z 14 View System 4 Screen selection switch 0 343 546 51800...