Y-5
Y-5
Adjusting Procedure (Electric)
37
WY04-2071E
1.6 Main wire rope length detection
(Phase A: CN525) (Phase B: CN526)
1. Apply a thread locking agent (ThreeBond 1401 or
the equivalent) to the threaded section of the
switch beforehand.
2. Adjust the position of the switch so that the
clearance A is 3.5
+0.2
–0.3
mm (0.14
+0.008
–0.012
in) and the
clearance B is 7
0
–1
mm (0.28
0
–0.04
in), and fix the
switch using a nut.
•
Nut tightening torque:
19 to 20 N-m {193 to 204 kgf-cm} (14 to 14.8 ft-lbf)
3. Make sure that the green LED lights up when the
switch is activated.
1.7 Aux. wire rope length detection
(Phase A: CN527) (Phase B: CN528)
1. Apply a thread locking agent (ThreeBond 1401 or
the equivalent) to the threaded section of the
switch beforehand.
2. Adjust the position of the switch so that the
clearance A is 3.5
+0.2
–0.3
mm (0.14
+0.008
–0.012
in) and the
clearance B is 7
0
–1
mm (0.28
0
–0.04
in), and fix the
switch using a nut.
•
Nut tightening torque:
19 to 20 N-m {193 to 204 kgf-cm} (14 to 14.8 ft-lbf)
3. Make sure that the green LED lights up when the
switch is activated.
△
2
349-503-30000
Summary of Contents for GR-700N
Page 1: ......
Page 8: ...7 WA04 4651E 6 Group index System Diagrams Data Adjustment and Checks Y Z Y Z...
Page 132: ...Z 6 Z 6 Hydraulic Parts Location Diagram Upper 28 WZ07 3531E 5 Return 4 343 463 53000...
Page 133: ...Z 6 Z 6 Hydraulic Parts Location Diagram Upper 29 WZ07 3531E 6 Drain Detail A 5 343 463 55000...
Page 134: ...Z 6 Z 6 Hydraulic Parts Location Diagram Upper 30 WZ07 3531E 7 Gauge 0 343 463 56000...
Page 135: ...Z 6 Z 6 Hydraulic Parts Location Diagram Upper 31 WZ07 3531E 8 Pilot 3 343 463 57000...
Page 139: ...35 WZ07 3531E Z 6 Z 6 Hydraulic Parts Location Diagram Upper 14 Jib main unit 2 343 463 43000...
Page 193: ...89 WZ03 7090E Z 14 Z 14 View System 3 3 Cable B 0 343 818 40450...
Page 199: ...95 WZ03 7090E Z 14 Z 14 View System 4 Screen selection switch 0 343 546 51800...