3 COMMISSIONING
3.1 General
Commissioning sequence:
1. Check that there are no foreign objects inside the unit,
duct system or functional sections.
COMPACT Heat: air recirculation section, louvre
damper and room temperature sensor shall be installed.
2. Connect the mains plug. Note that the air handling
unit starts up immediately and operates in the normal
mode.
3. Select the appropriate language, if you have not already
done so. See Section 14.1.
4. The air handling unit has a factory setting that makes
it ready to operate. See Section 21.1 Commissioning
Record.
However, in many cases, these settings need to be
adjusted to suit the current installation.
Program the timer (switch clock), operating mode,
temperatures, airflows and functions according to the
procedures in Sections 5-16.
Select whether the airflow unit of measurement shall
be l/s, m
3
/s or m
3
/h. (INSTALLATION LEVEL in the CON-
TROL DISPLAY menu).
Fill out the Commissioning Record and save it in the
document pocket of the air handling unit.
5. Activate, if needed, manual or auto operation (MAIN
MENU 2) or lock the speed of the fans (AIR ADJUST-
MENT menu).
6. Finish off with a filter calibration as described in Section
7.4.2.