Installation
– Bare Brickwork Set
29
[ I ]
7.
After the wall cut-out is completed install the electrical
cable (3 x 1.5 mm
2
) in the upper part of the wall box. Affix
the wall box flush with plaster,
perpendicularly
and secure
with wedges.
8.
Please note that different stucco thicknesses result when
matching wall curvature.
WARNING
• The wall box must be placed with millimeter
accuracy, so the freeAir 100 will fit tightly sealed.
• Leading edge of the wall box must sit
flush with
plaster
.
• Use sealing tape to assure a vapor proof connection
between wall box and wall.
9.
Use appropriate polyurethane foam to fasten corners of
wall box.
Once the foam has hardened add additional layers of
foam.
Take care not to allow expanding foam to deform the box.
Leave box bracing in place!
Summary of Contents for bluMartin freeAir 100
Page 1: ...Manual G General O Operation I Installation S Service ...
Page 20: ...Installation Bare Brickwork Set 18 I Drawings ...
Page 21: ...Installation Bare Brickwork Set 19 I ...
Page 23: ...Installation Bare Brickwork Set 21 I ...
Page 24: ...Installation Bare Brickwork Set 22 I ...
Page 25: ...Installation Bare Brickwork Set 23 I ...
Page 26: ...Installation Bare Brickwork Set 24 I ...
Page 27: ...Installation Bare Brickwork Set 25 I ...
Page 28: ...Installation Bare Brickwork Set 26 I ...
Page 59: ...Service S 57 For troubleshooting visit the website www bluMartin de freeair support ...