COOLING AND LUBRICATION SYSTEM 8-5
RADIATOR DISASSEMBLY
• Remove the reservoir tank
1
.
• Remove the coolong fan
2
and shield
3
.
• Remove the radiator guard
4
.
RADIATOR CAP INSPECTION
• Fit the cap
1
to the radiator cap tester
2
.
• Build up pressure slowly by operating the tester. Make sure
that the pressure build-up stops at 93 – 123 kPa (0.93 – 1.23
kgf/cm
2
, 13.2 – 17.5 psi) and that, with the tester held stand-
still, the cap is capable of holding that pressure for at least 10
seconds.
• Replace the cap if it is found not to satisfy either of these two
requirements.
$
Radiator cap valve opening pressure
Standard: 93 – 123 kPa
(0.93 – 1.23 kgf/cm
2
, 13.2 – 17.5 psi)
Summary of Contents for VZR1800 2007
Page 1: ...VZR1800...
Page 3: ......
Page 51: ...2 30 PERIODIC MAINTENANCE...
Page 57: ...White Page...
Page 116: ...ENGINE 3 59 TRANSMISSION PARTS LOCATION 1 Countershaft 2 Driveshaft...
Page 171: ...White Page...
Page 201: ...White Page...
Page 357: ...White Page...
Page 479: ...White Page...
Page 533: ...White Page...
Page 561: ......
Page 587: ......