3-106 ENGINE
• Pull the cam chain lightly.
• The intake camshaft sprocket has an arrow marked “1”
C
.
Turn the intake camshaft so that the arrow is aligned with the
gasket surface of the cylinder head.
• Engage the cam chain with the intake camshaft sprocket.
• The other arrow marked “2”
D
should now be pointing straight
up. Starting from the roller pin that is directly above the arrow
marked “2”
D
, count out 18 roller pins (from the intake cam-
shaft side going towards the exhaust camshaft side).
• Engage the 18th roller pin
E
on the cam chain with the arrow
marked “3” on the exhaust sprocket.
NOTE:
The cam chain should now be on all three sprockets. Be careful
not to move the crankshaft until the camshaft journal holders
and cam chain tension adjuster are secured.
Summary of Contents for VZR1800 2007
Page 1: ...VZR1800...
Page 3: ......
Page 51: ...2 30 PERIODIC MAINTENANCE...
Page 57: ...White Page...
Page 116: ...ENGINE 3 59 TRANSMISSION PARTS LOCATION 1 Countershaft 2 Driveshaft...
Page 171: ...White Page...
Page 201: ...White Page...
Page 357: ...White Page...
Page 479: ...White Page...
Page 533: ...White Page...
Page 561: ......
Page 587: ......