FUEL SYSTEM AND THROTTLE BODY 6-21
AIR CLEANER CHAMBER AND THROTTLE
BODY INSTALLATION
Installation is in the reverse order of removal. Pay attention to
the following points:
• Connect the fuel injector couplers to the fuel injectors. Make
sure that each coupler is installed in the correct position. The
color on each lead wire refers to the appropriate fuel injector.
Front injector lead wire
1
: Y/R and Gr/B
Rear injector lead wire
2
: Y/R and Gr/W
NOTE:
Fit the clamp
A
to the lead wire.
• Connect the TP sensor lead wire coupler
3
and STP sensor
lead wire coupler
4
.
"
TP sensor lead wire coupler
3
: Gray
• Connect the throttle pulling cable
5
and throttle returning
cable
6
to the throttle cable drum.
• Loosen each throttle cable lock nut.
• Turn in each throttle cable adjuster fully and locate each outer
cable so that the clearance is 0 mm (0 in).
• Tighten each lock nut.
• Adjust the throttle cable play.
Refer to page 2-19 for details.
• Install the air cleaner chamber and tighten the throttle body
clamp screws as shown in the illustration. (
!
11-41)
TP sensor lead wire coupler and STP sensor lead wire
coupler resemble each other very closely in external
appearance.
Make sure to check the color of coupler before install-
ing.
0 mm (0 in)
0 mm (0 in)
Summary of Contents for VZR1800 2007
Page 1: ...VZR1800...
Page 3: ......
Page 51: ...2 30 PERIODIC MAINTENANCE...
Page 57: ...White Page...
Page 116: ...ENGINE 3 59 TRANSMISSION PARTS LOCATION 1 Countershaft 2 Driveshaft...
Page 171: ...White Page...
Page 201: ...White Page...
Page 357: ...White Page...
Page 479: ...White Page...
Page 533: ...White Page...
Page 561: ......
Page 587: ......