GEARSHIFTING 9-3
GEARSHIFT LINKAGE
REMOVAL
• Drain transmission oil. (
2-7)
• Drain engine coolant. (
12-3)
• Remove the kick starter lever and clutch assembly. (
7-5)
• Remove the gearshift lever.
• Remove the gearshift shaft
2
.
• Remove the two screws. Remove the pawl lifter
3
.
• Remove the gearshift cam shifter
4
.
NOTE:
Be careful that the pins and springs do not fly off.
• Remove the gearshift pawls
5
, pins
6
and springs
7
.
• Loosen the gearshift cam bolt
8
and remove the stopper
plate
9
.
Summary of Contents for RM85
Page 1: ...Part No 99011 02B82 01A April 2006 EN TK RM85 L OWNER S SERVICE MANUAL ...
Page 10: ... MEMO ...
Page 42: ...3 TROUBLESHOOTING 3 1 CONTENTS TROUBLESHOOTING TROUBLESHOOTING 3 2 ENGINE 3 2 CHASSIS 3 5 ...
Page 47: ... MEMO ...
Page 85: ...7 2 CLUTCH CONSTRUCTION CLUTCH 70 N m 7 0 kgf m 50 5 lb ft ...
Page 93: ...8 2 KICK STARTER CONSTRUCTION KICK STARTER ...
Page 97: ... MEMO ...
Page 115: ... MEMO ...
Page 117: ...11 2 FUEL SYSTEM CONSTRUCTION FUEL SYSTEM ...
Page 121: ...11 6 FUEL SYSTEM REASSEMBLY Reverse the sequence of removal ...
Page 141: ... MEMO ...
Page 200: ...SERVICING INFORMATION 18 15 Radiator hose Throttle cable Clamp Clutch cable ...
Page 205: ... MEMO ...