15-2 FRONT AND REAR BRAKES
CONSTRUCTION
FRONT AND REAR BRAKES
(
)
(
)
(
)
(
)
10 N.m
(1.0 kgf-m, 7.3 lb-ft)
(
)
23 N.m
2.3 kgf-m
16.5 lb-ft
(
)
23 N.m
2.3 kgf-m
16.5 lb-ft
10 N.m
1.0 kgf-m
7.3 lb-ft
10 N.m
(1.0 kgf-m, 7.3 lb-ft)
23 N.m
2.3 kgf-m
16.5 lb-ft
18 N.m
1.8 kgf-m
13 .0 lb-ft
(
)
7.5 N.m
0.75 kgf-m
5.5 lb-ft
23 N.m
2.3 kgf-m
16.5 lb-ft
10 N.m
(1.0 kgf-m, 7.3 lb-ft)
Summary of Contents for RM85
Page 1: ...Part No 99011 02B82 01A April 2006 EN TK RM85 L OWNER S SERVICE MANUAL ...
Page 10: ... MEMO ...
Page 42: ...3 TROUBLESHOOTING 3 1 CONTENTS TROUBLESHOOTING TROUBLESHOOTING 3 2 ENGINE 3 2 CHASSIS 3 5 ...
Page 47: ... MEMO ...
Page 85: ...7 2 CLUTCH CONSTRUCTION CLUTCH 70 N m 7 0 kgf m 50 5 lb ft ...
Page 93: ...8 2 KICK STARTER CONSTRUCTION KICK STARTER ...
Page 97: ... MEMO ...
Page 115: ... MEMO ...
Page 117: ...11 2 FUEL SYSTEM CONSTRUCTION FUEL SYSTEM ...
Page 121: ...11 6 FUEL SYSTEM REASSEMBLY Reverse the sequence of removal ...
Page 141: ... MEMO ...
Page 200: ...SERVICING INFORMATION 18 15 Radiator hose Throttle cable Clamp Clutch cable ...
Page 205: ... MEMO ...