![Suzuki RM85 Owner'S Service Manual Download Page 163](http://html1.mh-extra.com/html/suzuki/rm85/rm85_owners-service-manual_1408692163.webp)
16-8 FRONT FORK AND STEERING
• Attach the stopper ring
7
securely to the stopper ring groove
of the outer tube.
• Attach the dust seal
8
.
NOTE:
After attaching the dust seal, make sure that there are no cracks
around the circumference of the seal. Cracks could allow water,
mud and the like to enter and cause an oil leak.
• Install the damper rod into the front fork.
• Apply THREAD LOCK SUPER “1322” to the front fork center
bolt.
99000-32110: THREAD LOCK SUPER “1322”
• Apply fork oil to the O-rings.
• Tighten the front fork center bolt to the special torque with the
special tool.
Front fork center bolt: 55 N·m (5.5 kgf-m, 40.0 lb-ft)
09940-30250: Front fork assembling tool
• Install the spring guide
1
, lock-nut
2
onto the inner rod.
CAUTION
Use of grease as a substitute fork oil when installing
the oil seal can result in an oil leak. Applying grease to
the dust seal and oil seal can cause dirt to accumulate
and damage the dust seal lip and oil seal lip.
Use only a thin coat of fork oil on the oil seal.
Summary of Contents for RM85
Page 1: ...Part No 99011 02B82 01A April 2006 EN TK RM85 L OWNER S SERVICE MANUAL ...
Page 10: ... MEMO ...
Page 42: ...3 TROUBLESHOOTING 3 1 CONTENTS TROUBLESHOOTING TROUBLESHOOTING 3 2 ENGINE 3 2 CHASSIS 3 5 ...
Page 47: ... MEMO ...
Page 85: ...7 2 CLUTCH CONSTRUCTION CLUTCH 70 N m 7 0 kgf m 50 5 lb ft ...
Page 93: ...8 2 KICK STARTER CONSTRUCTION KICK STARTER ...
Page 97: ... MEMO ...
Page 115: ... MEMO ...
Page 117: ...11 2 FUEL SYSTEM CONSTRUCTION FUEL SYSTEM ...
Page 121: ...11 6 FUEL SYSTEM REASSEMBLY Reverse the sequence of removal ...
Page 141: ... MEMO ...
Page 200: ...SERVICING INFORMATION 18 15 Radiator hose Throttle cable Clamp Clutch cable ...
Page 205: ... MEMO ...