
ENGINE MECHANICAL (K9K ENGINE) 6A2-19
3) Install intake pipe No.1 with new gasket.
Tightening torque
Intake pipe No.1 nut: 11 N·m (1.1 kg-m, 8.0 lb-ft)
4) Apply engine oil to new O-ring, and install intake pipe No.2
(2) with new O-ring.
Tightening torque
Intake pipe No.2 bolt (a): 10 N·m (1.0 kg-m, 7.5 lb-ft)
5) Install EGR valve (1) with new gasket.
Tightening torque
EGR valve bolt (a): 12 N·m (1.2 kg-m, 9.0 lb-ft)
6) Install oil vapor recirculation valve (5), and then connect
hose (2) to oil vapor recirculation valve.
7) Connect EGR valve connector (3) and boost pressure sen-
sor connector (4).
8) Connect negative (–) cable at battery.
EGR Valve Disassembly and Reassembly
Disassembly
1) Remove clamp (1) and EGR pipe (2) from exhaust gas
cooler pipe (3).
2) Hold EGR valve body with soft jawed vise (1), and remove
exhaust gas cooler (2) with gasket.
3) Remove EGR cooler (3) with gasket.
2
(a)
1
2
3
4
5
(a)
1
2
1
3
2
3
1