ELECTRICAL SYSTEM 9-15
ARMATURE COIL INSPECTION
Check for continuity between each segment and between each
segment and the armature shaft using the multi-circuit tester.
If there is no continuity between the segments or there is conti-
nuity between the segments and shaft, replace the armature
with a new one.
09900-25008: Multi-circuit tester set
Tester knob indication: Continuity test (
)
OIL SEAL INSPECTION
Check the oil seal lip for damage or leakage.
If any damage is found, replace the housing end.
STARTER MOTOR REASSEMBLY
Reassemble the starter motor in the reverse order of disassem-
bly. Pay attention to the following points:
• Apply SUZUKI SUPER GREASE “A” to the lip of the oil seal.
99000-25010: SUZUKI SUPER GREASE “A”
(or equivalent grease)
• Apply a small quantity of SUZUKI MOLY PASTE to the arma-
ture shaft.
99000-25140: SUZUKI MOLY PASTE
• Fit the projection of the starter motor case to the depression
of the housing end.
• Apply SUZUKI SUPER GREASE to the O-ring.
99000-25010: SUZUKI SUPER GREASE “A”
(or equivalent grease)
Summary of Contents for 2006 gsxr 600
Page 1: ...GSX R750 9 9 5 0 0 3 7 1 3 0 0 1 E ...
Page 48: ...PERIODIC MAINTENANCE 2 31 ...
Page 101: ...3 48 ENGINE TRANSMISSION PARTS LOCATION 1 Countershaft 2 Driveshaft ...
Page 154: ...ENGINE 3 101 10 N m 1 0 kgf m 7 0 lb ft ...
Page 324: ...7 20 COOLING AND LUBRICATION SYSTEM ENGINE LUBRICATION SYSTEM ...
Page 325: ...COOLING AND LUBRICATION SYSTEM 7 21 ...
Page 487: ...10 28 SERVICING INFORMATION SEAT LOCK CABLE ROUTING REAR FENDER INSTALLATION ...
Page 521: ...Prepared by December 2005 Part No 99500 37130 01E Printed in Japan 524 ...
Page 522: ...Printed in Japan K6 ...