
4-96 FI SYSTEM DIAGNOSIS
Step 4
1) Turn the ignition switch OFF.
2) Connect the position sensor coupler.
3) Measure the position sensor output voltage at fully close posi-
tion and fully open position.
4) Insert the needle pointed probes to the back side of the posi-
tion sensor lead wire coupler. (
+
Y
–
-
B/Br)
5) Disconnect the EXCVA motor lead wire coupler
2
.
6) To set the EXCV to fully close position, apply 12 V to
A
and
B
terminals.
Positive wire –
A
(P wire) terminal
Negative wire –
B
(Gr wire) terminal
7) Turn the ignition switch ON.
8) Measure the position sensor output voltage at fully close posi-
tion.
9) Then, to set the EXCV to fully open position, apply 12 V to
B
and
A
terminals.
Positive wire –
B
(Gr wire) terminal
Negative wire –
A
(P wire) terminal
10)Measure the position sensor output voltage at fully open
position.
Position sensor output voltage
EXCV is fully close: 0.5 – 1.3 V
EXCV is fully open: 3.7 – 4.5 V
(
+
Y –
-
W)
09900-25008: Multi circuit tester set
09900-25009: Needle pointed probe set
Tester knob indication: Voltage (
)
Is the voltage OK?
11)After repairing the trouble, clear the DTC using SDS tool.
(
4-27)
YES
Replace the ECM with a known good one, and
inspect it again.
NO
Go to Step 5.
4
12 V
4
V
4
12 V
Summary of Contents for 2006 gsxr 600
Page 1: ...GSX R750 9 9 5 0 0 3 7 1 3 0 0 1 E ...
Page 48: ...PERIODIC MAINTENANCE 2 31 ...
Page 101: ...3 48 ENGINE TRANSMISSION PARTS LOCATION 1 Countershaft 2 Driveshaft ...
Page 154: ...ENGINE 3 101 10 N m 1 0 kgf m 7 0 lb ft ...
Page 324: ...7 20 COOLING AND LUBRICATION SYSTEM ENGINE LUBRICATION SYSTEM ...
Page 325: ...COOLING AND LUBRICATION SYSTEM 7 21 ...
Page 487: ...10 28 SERVICING INFORMATION SEAT LOCK CABLE ROUTING REAR FENDER INSTALLATION ...
Page 521: ...Prepared by December 2005 Part No 99500 37130 01E Printed in Japan 524 ...
Page 522: ...Printed in Japan K6 ...