Chapter 2: Server Installation
2-7
Figure 2-3. Installing the Server into a Rack
(w/ Optional Rackmount Kit)
Installing the Server into a Telco Rack
If you are installing the SuperServer 6015V-MR/6015V-MRLP into a Telco type rack,
follow the directions given on the previous pages for rack installation. The only
difference in the installation procedure will be the positioning of the rack brackets
to the rack. They should be spaced apart just enough to accomodate the width
of the telco rack.
Summary of Contents for SUPERSERVER 6015V-MR
Page 1: ...SUPER SUPERSERVER 6015V MR SUPERSERVER 6015V MRLP USER S MANUAL Revision 1 0...
Page 5: ...v Preface Notes...
Page 10: ...Notes x SUPERSERVER 6015V MR 6015V MRLP User s Manual...
Page 16: ...1 6 SUPERSERVER 6015V MR 6015V MRLP User s Manual Notes...
Page 27: ...Chapter 2 Server Installation 2 11 Figure 2 6 Accessing the Inside of the Server...
Page 28: ...2 12 SUPERSERVER 6015V MR 6015V MRLP User s Manual Notes...
Page 32: ...3 4 SUPERSERVER 6015V MR 6015V MRLP User s Manual Notes...
Page 60: ...5 24 SUPERSERVER 6015V MR 6015V MRLP User s Manual Notes...
Page 66: ...6 6 SUPERSERVER 6015V MR 6015V MRLP User s Manual Figure 6 3 Removing the SATA DVD ROM Drive...
Page 68: ...6 8 SUPERSERVER 6015V MR 6015V MRLP User s Manual Notes...
Page 100: ...A 6 SUPERSERVER 6015V MR 6015V MRLP User s Manual Notes...
Page 106: ...B 6 SUPERSERVER 6015V MR 6015V MRLP User s Manual Notes...
Page 110: ...C 4 SUPERSERVER 6015V MR 6015V MRLP User s Manual Notes...
Page 114: ...D 4 SUPERSERVER 6015V MR 6015V MRLP User s Manual Notes...