User Manual
50
Step 7
After selecting the Grid Code, there
will be a “Pro-stage” type selection
screen and then corresponding
sub-menu will come up. For detailed
information, please refer to
“Protective Parameters Setting”.
Pro-Stage
Single-stage
Multi-stage
Step 8
Set the inverter time as per local time.
Incorrect time setting will affect the
data logging.
Press
to move the
cursor and
Press
to set the specific
time and date.
press
ENTER
to
confirm setting.
Time
Time: 10:30:55
YY/MM/DD
Date: 15/01/31
Step 9
Set the communication parameter.
Press
to move cursor and press
to set the appropriate value. Confirm
settings by Pressing
ENTER
. Device
address range: 1-247.
Modbus param
Addr 001
Step 10
After configuring all parameters,
there will be a “setting confirmation”
screen. Check whether all
above-mentioned parameters are
correct. Confirm by
press
ENTER
.
Cancel by Pressing ESC and reset.
Setting confirmation
Countries Other
Pro-stage Single-stage
Grid codes 50Hz
Date 2015/01/31
Confirm above settings?
Step 11
Inverter will enter into startup
process. Observe the status of LED
indicators and the LCD main screen. If
commissioning succeeds, the “RUN”
indicator will be on and “Run” will be
displayed on the “State” area.
kW
h
kW
h
15.6
497600
Run
kWh
kWh
kW
100.0%
P(%)
110
50
0
5 8 11 14
20
17
23
t
001
P-ac
E-day
E-tot
State
2015/01/31 10:30
33.000
If commissioning fails, the “FAULT” indicator will be on and “Fault” will occur on the
display.
Press
to view “current fault” information. Remove the existing fault and
then repeat the commissioning procedures.