User Manual
14
Tab. 3-1
Description of Installation Flow
Order Description
Reference Chapter
1
Unpacking and inspection
Section 4.1
2
Read this manual, especially the section on “safety
instruction”
Chapter 1
3
Store the inverter unit if not install immediately
Section 4.4
4
Choose the best installation site
Section 5.1
5
Moving the inverter to installation site
Section 5.2
6
Install the inverter against the chosen wall
Section 5.3
7
Electrical connections include DC, AC, ground and
communication(optional)connection
Section 6.3...6.7
8
Examine before commissioning
Section 7.1
9
Start up inverter and configure corresponding
parameters
Section 7.2
10
Troubleshooting
Section 9.1