4-8
Sun Java Workstation W1100z and W2100z User Guide
• January
2005
4.5
Customer Replaceable Unit (CRU)
Procedures
The following system components may be installed or replaced by the customer.
■
Hard disk drive (refer to
“Replacing or Adding Hard Disk Drives” on page
4-9
)
■
DVD drive (refer to
“Replacing a CD/DVD Drive” on page
4-12
)
■
Optional storage devices (refer to
“Replacing Optional Storage Devices” on
page
4-14
)
■
CPU (refer to
“Replacing a CPU” on page
4-15
)
■
DIMMs (refer to
“Replacing or Adding DIMMs” on page
4-28
)
■
PCI cards (refer to
“Installing a PCI or AGP Card” on page
4-31
)
■
Battery (refer to
“Replacing the System Battery” on page
4-38
)
■
System fan (refer to
“Replacing the System Fan” on page
4-39
)
■
Power supply (refer to
“Replacing the Power Supply” on page
4-41
)
■
USB Audio card (refer to
“Replacing the USB Audio Card Assembly” on
page
4-42
)
■
System cables (refer to
“Replacing System Cables” on page
4-44
)
■
Operator’s panel (refer to
“Replacing the Operator’s Panel” on page
4-43
)
■
Mezzanine card (refer to
“Replacing the Mezzanine Card” on page
4-47
)
■
Extender card (refer to
“Replacing the Extender Card” on page
4-49
)
Note –
The motherboard should be replaced only by trained field service
technicians.
■
Motherboard (refer to
“Replacing the Motherboard” on page
4-50
)
Summary of Contents for W1100z
Page 6: ...vi Sun Java Workstation W1100z and W2100z User Guide January 2005 ...
Page 22: ...1 12 Sun Java Workstation W1100z and W2100z User Guide January 2005 ...
Page 28: ...2 6 Sun Java Workstation W1100z and W2100z User Guide January 2005 ...
Page 48: ...3 20 Sun Java Workstation W1100z and W2100z User Guide January 2005 ...
Page 83: ...Chapter 4 Maintaining the Workstation 4 35 FIGURE 4 24 Installing the AGP Card 1 2 ...
Page 106: ...A 4 Sun Java Workstation W1100z and W2100z User Guide January 2005 ...