2-18
2.Basic splicing operation
|
Optical fiber splicing
2. Basic splicing operation
If “Arc Power Too Weak”, “Arc Power Too Strong” or “Arc Center” is displayed,
prepare the fiber again and repeat the test until “Good arc state.” is displayed.
(Refer to the previous page.)
■
Arc test procedure
4: The melt back distance of the left
and right fibers and the arc center
position which are measured via
image processing are displayed on
the monitor screen. (The arc center
position value is displayed only if the
position is shifted.)
5: After “Good arc state.” displayed,
begin the fiber preparation
procedure to perform a splice.
2: Tap Arc test icon ( ) on the
Settings panel.
1: As mentioned in the previous
pages, load a prepared fiber. (The
coating is removed and fiber is
cleaved.)
▸
P.2-16 Inserting fibers into the splicer
3: After “Arc Test Ready” appears,
tap the Set icon
or press the
Set key
. An arc test is started.