![Suez CheckPoint Pharma Owner'S Operation And Maintenance Manual Download Page 51](http://html1.mh-extra.com/html/suez/checkpoint-pharma/checkpoint-pharma_owners-operation-and-maintenance-manual_1389717051.webp)
CheckPoint Pharma and CheckPoint
e
Operation and Maintenance Manual
SUEZ © 2018
51 of 112
DLM 97200-03 EN Rev. A
Figure 8: Attaching the Existing Power Wires
13. Route the power wiring into the Sensor through the pass-through port in the power module panel.
You can also choose to install a strain relief hub at the pass-through port.
N
OTE
: Wire should be 18-12 AWG, rated to 300 Volts. The strip length should be 8 mm (.33 in).
14. Connect the power wires to the terminal block, with the line (brown or black wire) connected to
the port on the left and neutral (blue or white wire) connected to the port on the right. See
Connecting the Power Wiring (With Conduit). For each wire, insert the wire into the port
and then use a small screwdriver to tighten the screw on the top of the terminal block to secure
the wire.