18
1000 mm
800 mm
EN/06.2021/G23 © STULZ GmbH – all rights reserved
minispace cw original instructions
5. Installation
5.1 Selection of the installation site
The A/C unit is designed for the inside installation on a level base. The A/C unit is not appropriate for opera
-
tion in office rooms or other rooms sensitive to noise.
DAnGer
risk of explosion
The unit may not be operated in an explosive atmosphere!
• children, unauthorized persons and animals may not have access to the installation site of the A/C unit.
• check that the installation site is appropriate for the unit weight, which you can read in the technical data.
• take into account the necessary clearances for the maintenance and the air flow.
Maintenance
clearance
Size1-2
Size3-4
Maintenance clearance
Upfow units
Clearance for chilled water
connection
• Electrical connection
• Supply connections for:
- humidifier (optional)
- hot water reheat (optional)
Downflowunit
The A/C unit must be accessible from the front.
Upflowunit
The A/C unit must be accessible from the front and requi
-
res space on the left side for the supply connections.