background image

10mm (dia.) holes

Evacuated tubes

Figure 20

Angle  brace

(rear)

Figure 19

Ang

led b

race leng

th

Figure 18

Side brace

M10 screw & nut

Figure 17

Measured distance between mounting slots

Figure 16

Solarcore Collector Panel Fixture Holes

Two 10mm fastening holes are to be drilled through the 
base of the solar collector to create a robust connection 
to the frame rails (Figure 20). 

These holes must be located between the evacuated 
tubes on the flat base surface. It is also important that 
the holes line up horizontally for a square connection to 
the frame rail channel using the supplied socket screws 
and rail nuts. 

Rear Bracing

Angle bracing is also required between the upright rails 
at the rear of the unit. Two rear braces are required 
between the outer-most upright rails, regardless of the 
length of the unit. 

An angled distance is to be measured between 
neighbouring upright rails on the outer of the roof mount 
tilt kit frame (Figure 18). 

This measurement is used to determine the cut length 
required of the angle bracing and is to be as great as 
possible without interfering with additional fixtures. 

Like the horizontal brace, the rear angle bracing is to 
be cut to length and M10 holes drilled on site. Supplied 
M10 socket screws and rail nuts are used to secure the 
bracing to the upright rails (Figure 19).

It is to be noted that these braces located between the 
the outer-most upright rails must always angle inwards 
with the bottom of the brace being located on the outer 
rail at the bottom, and the top of the brace being located 
on the inner rail, as per the example of the dimension 
line shown in Figure 18.

The supplied brace is to be cut to the required length 
on site. Mounting holes are also needed to be drilled on 
site for mounting the brace to the roof bracket with the 
supplied M10 socket screw and nuts (Figure 17).

Summary of Contents for Solarcore G21520L666VE

Page 1: ...al Occupational Health Safety regulations Wind Regions Covered Flat Mount Kit Region A N1 N2 N3 Region B N1 N2 N3 N4 Checked to AS NZS 1170 2 2002 and AS4055 2006 Tilt Mount Region A N1 N2 N3 Maximum...

Page 2: ...e tank During extended absences in summer it is advisable to cover the solar collector to avoid overheating the system and excessive dumping of hot water from the P TR valve Hydrogen Gas Warning For v...

Page 3: ...ect heat from sunlight during cool windy or even overcast weather The heat is rapidly transferred to water passing through copper pipes inside the evacuated glass tubes A pump circulates the heated wa...

Page 4: ...NUT Qty 4 or 6 ANGLE BRACE M10 NUT Qty n a M10 SOCKET BOLT Qty n a M10 WASHER Qty n a ANGLE BRACE SHORT FRAME RAIL RAIL NUT TILT BRACKET CGI ROOF BRACKET FLAT ROOF BRACKET TILT MOUNT CIRCULATION PUMP...

Page 5: ...Litre Number of Collectors 2 3 3 Continuous Flow Gas Boost Size L min 20 26 20 26 20 26 Weight Cylinder Empty kg 88 95 Connections All connections parallel pipe threads of whitworth form Solar Flow a...

Page 6: ...Up Time 45 C Rise 2hrs 55min 4hrs 40min Recovery Rate Litres per Hour 45 C Rise 69 69 Weight Cylinder Empty kg 88 103 Connections All connections parallel pipe threads of whitworth form Solar Flow an...

Page 7: ...SX 65 C 65 C Switch on Temp Reheating TO 40 C not used N A Switch off Temp Reheating TF 40 C not used N A Freeze Protection Function Collector AF 1 freeze prot function active N A Operating Mode MM 4...

Page 8: ...f true North is acceptable Mounting the solar collector on a North East or North West facing roof will only reduce solar collector efficiency by approximately 5 Solar Collector Inclination The ideal i...

Page 9: ...e hook on the bottom stainless steel straps with the markings Fasten the bottom stainless steel straps to the roof battens using two hex head self drilling wood or metal screws as shown in Figure 6 It...

Page 10: ...er and seal the opening of the orifice with a small amount of silicon Run the hot temperature sensor leads under a tile into the roof space and down to the solar pump controller but do not connect at...

Page 11: ...In Region B Terrain Category 1 where roof mount tilt kits are attached to steel framing the steel framing rafter spacing is limited to maximum 1200mm Regulations OH S Before starting construction and...

Page 12: ...he batten and roof sheet using two M6 TS self drilling screws as noted in the Layout Rules within this section of these instructions A protective anti corrosion barrier must be installed between dissi...

Page 13: ...and second frame rail at one end to stop the frame from tipping thereby keeping a square alignment Upright Rail Positioning Position a series of roof brackets corresponding to the front row at the di...

Page 14: ...led distance is to be measured between neighbouring upright rails on the outer of the roof mount tilt kit frame Figure 18 This measurement is used to determine the cut length required of the angle bra...

Page 15: ...de of the solar collector panel when tightening the rail nuts When all inlet and outlet nuts are threaded firmly and the solar collector panels are in the desired position tightly fasten the rail nuts...

Page 16: ...hed power point IMPORTANT NOTE The controller is factory programmed to the correct settings These settings must not be altered Toensurefrostprotectionthepowermustremainconnected to the electronic cont...

Page 17: ...Location The hot water storage tank should be located as close as possible to the most frequently used hot water outlets to minimise water wastage and heat loss Also consider that the solar collector...

Page 18: ...n wear of the P TR valve Approved pressure limiting valves rated at 500kPa must be fitted if the mains water supply pressure exceeds 500kPa A combination non return isolating valve and strainer is fit...

Page 19: ...pansion control valve and tee to the cold water inlet connection at the bottom of the hot water storage tank A pressure limiting valve is required if the water supply pressure exceeds 500kPa Fit the s...

Page 20: ...8 Solar collectors Supplied by Installer 2 DN15 Solar return pipe insulation connections 5 DN20 copper tube 20mm thick insulation connections 6 Gas supply pipe Isolating valve Disconnection union fitt...

Page 21: ...external installation For external installation the hot water storage tank should be mounted on a concrete base at least 50 mm thick in accordance with AS NZS 3500 4 clause 4 5 3 or on well seasoned...

Page 22: ...connection details The installation of the electric boosted Stratco SolarcoreTM hot water system is now complete Follow the commissioning procedure carefully to ensure the electric boosted solar hot...

Page 23: ...e limiting valve 9 DN15 Water supply pipe connections 10 DN15 Solar flow pipe insulation connections 17 Tempering valve 18 Hot water non return valve 19 240V Power Supplied in Kit 1 Hot temperature se...

Page 24: ...red green to show the pump is running Press the button to exit the settings menue until TC and TS are shown in the display OUTDOOR CONTROLLER Press and hold the pump button The circulating pump shoul...

Page 25: ...he power points for the electronic controller circulating pump or the water supply For gas boosted systems switch off the power points for the gas booster To ensure frost protection do not switch off...

Page 26: ...nk Check mains water isolating valve to inlet of hot water storage tank is open Check mains water isolating valve at water meter is open Check water flow at a cold water tap and contact the water supp...

Page 27: ...the solar collector should be checked for vacuum every 5 years This is indicated by a silver coating at the bottom of the glass tube If the bottom of the glass tube has turned white or clear the glas...

Page 28: ...d systems or isolate power supply to the heating element at the mains for electric boosted systems Close the isolating valve on the cold water supply to the hot water storage tank Disconnect the elbow...

Reviews: